Suzhou TaiDeMaiTe Environmental Protection Technology Co., Ltd.VIP

专注于 通风系统设计,开发,生产及销售于一体的综合性企业
Enter Shop

PP Spray Tower

平台认证
  • Unit Price

    Negotiable

  • Brand

    Suzhou Lapmat

  • MOQ

    1Unit

Contact
Leave Msg

Platform Service

Supplier Verified



苏州泰德麦特环保科技有限公司

VIP   采商通第3年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Suzhou Lapmat

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Unit

  • Total:

    1000Unit

  • Address:

    JiangsuSuzhou

  • Delivery:

    0Hours

  • View More

Description

PP Spray Tower Manual

Section 1: Composition, Characteristics, and Application Range of PP Spraying Towers

PP Spray Tower consists of shell, circulating water tank, inlet section, spray layer, packing layer, demisting layer, outlet cone cap, inspection holes, etc. Made of PP material, it offers UV resistance and aging resistance. For the treatment of inorganic waste gas, the liquid absorption and neutralization method is commonly used. This process and product feature simple structure, low energy consumption, high purification efficiency, and wide applicability. The packing uses high-efficiency, low-resistance Raschig rings, Pall rings, etc., and the spray layer is assembled with sufficient atomizing nozzles. The nozzles are designed for easy disassembly, facilitating cleaning of scale and blockages, and easy maintenance and replacement.

Ideal for treating continuous and intermittent emissions of waste gas; simple in process, easy in management, operation, and maintenance without affecting the workshop production; wide applicability for purifying various inorganic waste gases, water-soluble waste gases, and dust-containing gases simultaneously; low pressure drop, high operating flexibility, and excellent dehumidifying performance.

Section 2: Working Principle of the PP Spray Tower

Waste gases are introduced into the purification tower through ducts. The absorbent liquid is pressurized by a pump at the bottom of the tower and sprayed from the top, where it cascades down through the packing layer. Here, the waste gases and absorbent liquid have ample gas-liquid contact, leading to acid-base neutralization reactions. The mixture is then returned to the bottom of the tower for recirculation. After purification, the gas is further dehumidified and demisted by a mist eliminator plate before being exhausted into the atmosphere by a fan.

Section 3: Process Flow Diagram

 

Operation Instructions

1. Pre-test Preparation Work:

Prior to activating this system, a comprehensive check is required, verifying and confirming each item against the installation diagram, ensuring everything is in place, and clearing all visible debris within the system.

(2) Prior to initiating this system, all pipelines, equipment, and other facilities within the system must undergo corresponding inspections to ensure their performance is good and meets testing requirements.

(3) Prior to initiating this system, it must be confirmed that the power, water supply, and drainage systems compatible with this system are operating normally and fully meet the requirements for the system's test operation.

2. Routine Startup Procedures:

Power on and sequentially start the circulating pump and fan. Check for any abnormal conditions with the working indicator lights.

After completing the task, shut down the fans and circulating water pump sequentially.

3. Routine Maintenance Matters:

(1) Conduct a weekly routine check of the storage tank's liquid level to maintain proper fluid height.

(2) If the automatic make-up water or non-makeup water device of the exhaust gas tower level control fails, disconnect the power and restart it. If it still cannot return to normal operation after the restart, check if there are loose connections at the circuit points and whether the circulating water pump or dosing unit is operating normally.

(3) Regularly inspect the operation of the exhaust fan.

(4) Daily operation and maintenance of the exhaust gas purification tower are recommended to be handled by a dedicated person.

(5) Repair of purification tower equipment is not permitted while in operation.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuSuzhou
Stock 1000UnitMOQ1Unit
Brand Suzhou Lapmat
PP Spray Tower includes: Housings, circulating water tanks, inlet sections, spray layers, packing layers, demisting layers, exhaust cone caps, inspection ports, etc.
Principle of operation for the PP spray tower Waste gases are introduced into the purification tower through a duct.
Before initiating this system Ensure compatibility with the power system for this system
Expiry Long Valid
Update 2025-11-24 16:04
Gallery

Suzhou TaiDeMaiTe Environmental Protection Technology Co., Ltd.Published byPP Spray TowerGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top