Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd.VIP

建设工程施工,建设工程质量检测,室内环境检测,检验检测服务等
Enter Shop

Enshi Lightning Protection Device Safety Inspection Qualification Annual Lightning Protection Inspection Institution

平台认证
  • Unit Price

    Negotiable

  • Brand

    Premium quality

  • MOQ

    1square meters

Contact
Leave Msg

Platform Service

Supplier Verified



湖北省精量建设工程质量检测有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Premium quality

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1square meters

  • Total:

    20000square meters

  • Address:

    HubeiWuhan

  • Delivery:

    3days

  • View More

Description

Basic Inspection Precautions
(1) Two main steel bars for the grounding body at the basic level are electrically continuous throughout, and are connected with the reinforcement in the pile foundation and the reinforcement inside the columns. Material specifications are in accordance with the design requirements of the drawings. The diameter of the cross-connected reinforcement is not less than 12mm.
(2) Double-sided welding should be used at the intersections of steel bars and at points of equipotential bonding, with a lap length of not less than 6D.
(3) The connection points between the total equipotential and grounding devices are not less than two.
(4) Potential equalization should be designed and reserved as shown in the diagram (areas with bathing facilities, vertical strong and weak electrical shafts, transformer substation rooms, telecommunication rooms,弱 electrical rooms, elevator machine rooms, pump rooms, boiler rooms, etc.).
(5) Reinforcement bars used as grounding devices and down conductors should have corresponding color coding.

Process Inspection Precautions
(1) Utilize two ≥φ16 diagonal rebars or four φ12 vertical rebars within the column, continuously welded to the roof as lightning rod down conductors.
(2) The use of equipotential bonding in bathrooms and lightning protection devices, with the beam extracted or utilized, or the column reinforcement connected to the grounding device (no use of down conductors).
(3) Potential grounding terminals from the grounding device are led to the elevator machine room and power and signal cable wells, extending to each floor (not using down lead lines) and electrically connected to the main steel reinforcement of the structure at each floor.
(4) Buildings classified as Category II and III lightning protection with rolling sphere radii (45m for Category II, 60m for Category III), for objects on the horizontal exterior walls, when the corresponding rolling sphere radius sphere descends vertically from the perimeter of the roof's lightning rod to the ground and contacts an object on the exterior wall, appropriate lightning protection measures should be implemented.
(5) Buildings over 60 meters tall in categories 2 and 3 should have their upper sections, which account for 20% of the height and exceed 60 meters, protected against side lightning strikes: Use the reinforced steel of the hoop beam connected to the lightning protection system to lead flat steel to the metal windows and railings on the outer wall, for grounding purposes of doors, windows, and railings.


Building Lightning Protection System Inspection

1. Lightning arrester
Test Parameters: Protection Range, Electrical Connections (Transition Resistance Value), Splice Length, Cross-sectional Rust Area, Spacing and Height of Fixed Brackets, Vertical Tension of Supporting Components, Mesh Size, Lightning Arrester Height, Material Specification Dimensions, Vertical Distance of Isolation Loop, Ground Resistance

2. Draw down lines
Inspection Parameters: Fixed Bracket Spacing, Lap Length, Cross-Section Rust Area, Vertical Tension of Fixed Bracket, Average Spacing, Material Specification Dimensions, Transition Resistance from Down conductor to Air Terminal, Disconnecting Card Setting Height, Transition Resistance from Down conductor to Grounding Device, Grounding Resistance

3. Grounding Device
Test Parameters: Transition Resistance, Power Frequency Ground Resistance Value, Impulse Ground Resistance Value, Soil Resistivity, Large Ground Grid Ground Resistance, Material Dimensions of Conducting Wires, Soil Resistivity

4. equipotential bonding
Test Parameters: Transition Resistance Value, Material Specifications and Dimensions

5. Surge Protection Device (SPD)
Test Parameters: Conductor Cross-sectional Area, Lead Length at Both Ends, Transition Resistance, Sensitivity Voltage, Leakage Current, Insulation Resistance

6. Lightning-Strike Electromagnetic Pulse Shielding
Test Parameters: Transition Resistance Value, Material Specification Dimensions

7. Electrostatic Protection
Test Parameters: Transition Resistance, Ground Resistance, Static Potential, Surface Resistance

Enshi Annual Lightning Protection Inspection Institution Coverage: Laifeng City, Enshi City, Lichuan City, Jianshi City, Xianfeng City, Badong City, Xuanen City, Hefeng City.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HubeiWuhan3dayswithin
Stock 20000square metersMOQ1square meters
Brand Premium quality
Product Name Enshi Lightning Protection Device Safety Inspection Qualification Annual Lightning Protection Inspection Agency
Advantage 1 One-on-one service
Advantage 2 Full-service solution
Expiry Long Valid
Update 2023-04-24 14:04
Gallery

Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd.Published byEnshi Lightning Protection Device Safety Inspection Qualification Annual Lightning Protection Inspection InstitutionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top