Zibo Xinhong Pipeline Material Co., Ltd.VIP

孔网钢带复合管、钢丝网骨架塑料复合管、钢骨架塑料复合管;pe管、及配套电热熔管件
Enter Shop

Steel frame tee

平台认证
  • Unit Price

    Negotiable

  • Brand

    Sun Hong Pipes

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



淄博信宏管道材料有限公司

VIP   标王第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Sun Hong Pipes

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0

  • Address:

    ShandongZibo

  • Delivery:

    3days

  • View More

Description


Electrofusion fittings are plastic (polyethylene) pipe accessories that can be melted and connected by the heat produced through electrical current.

Tools required for construction: pipe cutting machine; grinder (polishing disc), marker pen; electric melting welder (compliant with ISO 12176-2). Recommended models: Jinan Batada 315A type (for diameters under 200mm) or Tianjin Zhengwei welder.


Install plastic composite pipe materials for wire mesh and perforated steel belt require: pipe cutting machine; trimming blade, grinder (polishing disc), marking pen; electric fusion welder (compliant with ISO 12176-2). Recommended: Jinan Bada 315A type (for diameters below 200) or Tianjin Zhengwei welder.


Installation and usage steps are as follows:
Vertically cut pipe material, remove the surface oxide layer from the position where the pipe is to be inserted into the electrofusion fittings using a scraper. Mark the depth of insertion of the electrofusion fitting on the pipe surface with a marker pen. Insert the pipe into the electrofusion fitting until it reaches the marked depth. After installation, align the pipe's axis with the electrofusion fitting. Secure the pipe and fitting with clamps to prevent misalignment and loosening during welding.

Installation and construction precautions:
During installation, the inner wall of the electric fusion fittings and the fusion area of the pipe material must be free from organic matter and other contaminants. When welding the fittings, maintain a safe distance until the welding has cooled for 30 seconds. Adjust according to the temperature and working voltage of the site environment. Insulate the electric fusion fittings well to prevent heat loss. In environments with significant temperature differences, use straighteners and other tools to secure the pipe materials on both sides of the electric fusion fittings to avoid heat expansion and contraction affecting the welding quality. Appropriately compensate for the welding time during welding. Input a matched power source according to the requirements of the electric fusion welder. The farther the distance from the electric fusion welder, the larger the wire diameter of the power supply cable is required to avoid under-voltage affecting the welding quality. During pipe installation, ensure the elbows and tees are properly supported and braced or mounted on supports, and make appropriate pipe compensation. The pipe material burial must be below the frozen soil layer. During installation and welding, the pipe cannot be soaked in water. When the temperature is low, do not move the pipes and fittings during the cooling process.
Zibo Xinhong Pipeline Material Co., Ltd. is a professional manufacturer of composite pipes. We are an integrated modern enterprise engaged in the research and development, production, sales, technical support, and installation services of composite pipes.
Products are widely used in municipal tap water supply and chemical industry.Pipelines and equipment for power, heating, and mining industries, fully meeting the needs of the national water supply industry, industrial and mining enterprises, and factory construction.

Our entire staff will, as always,High-qualityProducts & Services, partnering with domestic and international traders to create brilliance together!
For detailed inquiries, please call: 13001502838



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery ShandongZibo3dayswithin
Brand Sun Hong Pipes
Equipment Type 1 Steel frame tee
Equipment Type 2 Steel frame tee
Equipment Type 3 Steel frame tee
Expiry Long Valid
Update 2023-09-22 15:23
Gallery

Zibo Xinhong Pipeline Material Co., Ltd.Published bySteel frame teeGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top