Lianyungang Bangjiu Petrochemical Equipment Manufacturing Co., Ltd.VIP

炼油、化工生产专用设备制造;炼油、化工生产专用设备销售;电容器及其配套设备制造
Enter Shop

化工储罐源头厂家

平台认证
  • Unit Price

    $2888.00/Tai

  • Brand

    Jusheng

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



连云港邦久石化装备制造有限公司

VIP   采商通第4年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Jusheng

  • Unit Price:

    $2888.00 / Tai

  • MOQ:

    MOQ1Tai

  • Total:

    99Tai

  • Address:

    JiangsuLianyungang

  • Delivery:

    3days

  • View More

Description

1. Definition

The gas storage tank is used for buffering air and has a cooling effect (the exhaust temperature of an air compressor is around 70-80℃). Its most important function is to initially remove water and oil. The tank can remove up to 70% of oil and water, making the storage tank an indispensable equipment for air compressors.

Section II: Function

1. Air Storage: There is no storage for compressed air within an air compressor. Once the compressed air reaches the preset pressure, it is exhausted. By using an air receiver, finished compressed air can be stored, ensuring more stable air usage.

2. Pressure Stability: During the operation of an air compressor, the air pressure is unstable and fluctuates greatly. An air storage tank can be used to control the air pressure within an appropriate range, andEliminateFlow fluctuations in the pipeline. Through the air storage tank, the compressed air output from the air compressor will have a buffer zone, which is of good quality and can maintain the set value. The gas system can achieve relatively stable pressure.

3. Cooling Filtration: The temperature of the finished compressed air entering the gas storage tank will be reduced to achieve the effect of preliminary cooling of the compressed air. At the same time, it can deposit some water and oil in the compressed air, enhancing the quality of the finished compressed air.

Section 3: Installation

1. Full-welding Method: The full-welding method involves first welding the base of the tank to the foundation, then assembling and welding the annular plates of the tank wall to the base. Next, the bottom plate is welded, followed by mechanically assembling and welding each piece of the second wall panel to the annular plate. The longitudinal seam of the second wall panel is then welded, as well as the circumferential seam between the second wall panel and the annular plate. This process is repeated sequentially until the assembly and welding of the next wall panel are complete. Large floating roof tanks typically use the full-welding method for construction, with automatic welding generally employed for both wall and bottom plate welding.

2. Inverted Method: The construction sequence of the inverted method is the opposite of the conventional method. The sequence is as follows: lay the tank bottom plate → install the annular wall panels on the laid bottom plate → manufacture and install the tank roof → lift the entire assembly → install the next annular wall panel → lift the entire assembly again → continue this process from the top down until the next annular wall panel is installed.

 




Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $2888.00 / Tai
Sales None
Delivery JiangsuLianyungang3dayswithin
Stock 99TaiMOQ1Tai
Brand Jusheng
Brand Jusheng
Origin Lianyungang, Jiangsu
Material Stainless Steel
Expiry Long Valid
Update 2023-08-08 08:20
Gallery

Lianyungang Bangjiu Petrochemical Equipment Manufacturing Co., Ltd.Published by化工储罐源头厂家Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top