Corrosion-Resistant Spiral Steel Pipe Precautions
One, during construction, check if groundwater or rainwater has contacted the pipeline. If water has touched the pipeline, the outer casing should be dried.
While installing piping materials, ensure gentle handling and prohibit impacts and falls.
Section 3: The insulation layer of thermal insulation pipes must not come into contact with burning flames to prevent the insulation layer from being burned off.
Four, pipe materials and fittings should be stored on a relatively flat ground, neatly stacked, with the stacking height not exceeding 1.5 meters.