
Corrosion-Resistant Spiral Steel Pipe Precautions
1. During construction, check if groundwater or rainwater has come into contact with the pipeline. If water has touched the pipeline, the outer casing should be dried.
During the installation of piping materials, ensure gentle handling and prohibit impacts and falls.
Three, the insulation layer of the thermal insulation pipeline must not come into contact with burning flames to prevent the insulation layer from being burned off.
Four, pipe materials and fittings should be stored on a relatively flat ground, neatly stacked, with the stacking height not exceeding 1.5 meters.































