
Corrosion-Resistant Spiral Steel Pipe Precautions
During construction, check if groundwater or rainwater has come into contact with the pipeline. If water has touched the pipeline, the outer casing should be dried.
During the installation of piping materials, ensure gentle handling and prohibit impacts and falls.
Section 3: The thermal insulation layer of the thermal insulation pipe must not come into contact with the burning fire to prevent the insulation layer from being burned off.
Four, piping materials and fittings should be stored on a relatively flat surface, neatly stacked, with the stacking height not exceeding 1.5 meters.































