Manufacturing and installation of purification equipment; construction of environmental purification and mechanical and electrical installation projects; processing and sales of metal products; metal processing, general road cargo transportation; and independent and agency import and export of various goods and technologies (excluding those goods and technologies that are limited for business operation or prohibited for import and export by the state).



















价 格Negotiable
最小起订0 piece库存0 piece
Sterile Laboratory | Sterile Room
Negotiable
Clean Water Trays | Stainless Ste
Negotiable
Clean Bench
Negotiable
Color steel panel installation |
Negotiable
Sample Vehicle
Negotiable
GMP Cleanroom | Cleanroom
Negotiable
Sterile Food Processing Facility
Negotiable
Air Shower Room
Negotiable
Air Shower Room
Negotiable
Cleanroom | Electronic Cleanroom
Negotiable
Cleanroom Building Floor Plan Layout:
The architectural layout of cleanroom construction should fall under the professional scope of architecture. However, due to the requirement of separating people and materials in cleanrooms and maintaining the static pressure gradient between different cleanroom operation areas, the architectural layout requirements for the cleanroom construction project include the following points:
1. The purification room engineering features a centralized independent anteroom serving as an airlock for each purification area. The airlock is in simultaneous communication with the various operation rooms, ensuring that air from the low-purity zone does not渗透 into the high-purity zone.
2. Cleanroom staff change into attire and shoes in the locker room, wash hands in the washroom, pass through the anteroom, air shower room, and various operation rooms.
3. Logistics within the cleanroom pass through an external corridor, are disinfected via a mechanical interlocked disinfection pass-through, then enter the buffer corridor, and finally proceed to the individual operation rooms within the dust-free cleanroom through another pass-through.
Personnel flow through changing rooms to change clothing and shoes → Wash hands in the cleaning area → Buffer area → Air shower room → Various operation rooms







Phone Consultation