Purchase Process
1. Contact online customer service or call15067702868Inquire about product information
2. Determine the model, quantity, payment method (wire transfer, collection on delivery), transportation, and after-sales service.
3. Fax the purchase and sale contract into effect
4. Both parties shall fulfill their responsibilities and obligations as stipulated in the contract.
Application Range
1. Suitable for hazardous areas classified as Zone 1 and Zone 2 explosive gas environments.
2. Suitable for IIA, IIB, IIC explosion-proof gas environments.
3. Suitable for combustible dust environments in Zones 20, 21, and 22.
4. Suitable for environments with temperature categories T1-T6.
5. Suitable for explosive and hazardous environments in oil and petrochemical, chemical, brewing, pharmaceutical, paint, textile, dyeing and finishing, and facility industries.
Product Features:
1. This product is a Senen explosion-proof product, which can internally accommodate explosion-proof buttons, explosion-proof indicator lights, explosion-proof ammeters, explosion-proof switches, explosion-proof voltmeters, and other instruments and control components required.
2. Available for in-box operation, remote operation, or dual-site operation.
3. Available for installation of protective case upon customer's request, capable of displaying the internal control section, offering high outdoor protection effectiveness.
All fasteners are made of corrosion-resistant 304-316L stainless steel.
Technical Specifications:
Explosion-proof marking: Ex d II A - C T4 - T6 DIP A20, A21 TA, T4 - T6
Rated Voltage: AC 220-380V, DC 12V-127V
Corrosion Resistance Grade: F2/WF2
Protection Class: IP54, IP56, IP65
Thread Specifications: DN15 - DN100/G1/2' - G4'
Flow Direction: Inflow at the top, outflow at the bottom; left inflow, right outflow (unrestricted)
Line specification: 4mm - 80mm (detailed in drawings)
Installation and Maintenance
Before installation, check if the data matches the actual usage.
Check all fasteners for looseness, and tighten if necessary.
3. Ensure reliable and effective grounding both inside and outside the junction box.
4. During installation, the cable must pass through a sealing ring, a metal washer, and be tightened with a locking nut to ensure a seal and that the cable does not loosen. Unused terminals should be sealed with a sealing ring and a metal washer.
5. Power must be disconnected before the cover can be opened during maintenance checks.
































