Steel pipes are processed with external shot blasting to achieve the specified ST2.5 grade. After shot blasting, the pipes are then transferred to a medium-frequency heating unit for heating. Once heated, an epoxy powder coating is applied, followed by the application of a filament winding adhesive layer. After the adhesive layer is coated, a specified thickness of polyethylene layer is applied as per regulations.






























