How to obtain a Saudi CB Certification
The CB System (International Electrotechnical Commission System for Electrical Product Conformity Testing and Certification) is an international system operated by the IECEE. The certification bodies of IECEE member countries test the safety performance of electrical products based on IEC standards, and the test results, i.e., the CB Test Reports and CB Test Certificates, are mutually recognized among the member countries of the IECEE. The purpose is to reduce international trade barriers caused by the need to meet different national certification or approval criteria. IECEE is the acronym for the International Electrotechnical Commission's Organization for Electrical Product Conformity Testing and Certification.

CB Certification Process
1. Fill out the CB Test Certificate application form in English (typed) and submit it to Quality Science (Qstlab).
2. Sample Inspection (if there are issues with the sample, it will need to be rectified and retested).
3. Draft and confirm the report.
4. Submit product information and reports to the certification authorities (KTL, BV, ITS, TUV, etc.).
5. Submit the review report by the institutional engineer (including questions and answers) to the visa officer.
6. Approval granted, certificate issued.
7. Mail the certificate to the client.
Documents required for CB Certification
1 Customer Application Form
2 Product Model Variations List (Differences for All Models)
3. Critical Device List (CDF)
4 LED Specifications (Lamps Provided)
Transformer Specifications Sheet
Motor Specifications Sheet
Inductor Specifications Sheet
5 Product Instruction Manual:
GS requires a German version, PSE needs a Japanese version, others only require English versions.
Product Label:
7 Product exploded drawing
(Lighting and home appliances required)
8 Circuit Diagram, Layout Diagram
- Schematic, layout, and full lamp wiring diagram for LED modules (required for lighting fixtures)
If power is included, please provide the power schematic and layout diagram.
If an internal controller is present, please provide the internal controller's schematic and layout diagrams.
9 BOM Sheets