Solar PV U-shaped and C-shaped bracket production equipment
Molding Production Line Process:Coil Unwinding & Opening----Leveling & Feeding Integrated Machine----Molding Main Unit (Gear Rolling, Marking)---Straightening Device----Cutting System----Receiving Platform---Electrical Control with PLC Programmable Logic Controller
Automatic Punching Line ProcessWorkbench - Pneumatic Clamps, Servo Feeding Units ---- Hydraulic (Press) Punching
Electrical control uses PLC programmable logic control
Punching method: Depending on the actual situation and considering various factors, post-molding is adopted.
Customizable into a one-step punching and forming production line
Equipment Technical Requirements
1. Technical Equipment Conditions:
1.1 Equipment Footprint: 25×3.5×5 (Length×Width×Height) meters.
1.2 Equipment Material Direction: TBA.
1.3 Voltage Parameters: 380V, 50Hz, 3-phase.
1.4 Gas Source: Flow rate of 0.5 m³/min; pressure of 0.6 MPa.
1.5 Hydraulic Oil: 46# Hydraulic Oil.
1.6 Gear Oil: 18# Hypoid Gear Oil.
2 Main Technical Parameters of Equipment
2.1 Rolling Strip Width: ≤300 mm
2.2 Rolling Strip Thickness: 2.0~2.5 mm
2.3 Rolling Strip Material: Q235
2.4 Production Speed: Approximately 0-14 meters per minute across the entire line
2.4 Rolling workpiece length: 2000-6000 mm
2.5 Total installed equipment capacity: approximately 35KW.
3. Rolling Product Range
3.1 This stamping/molding unit can roll U-shaped sections with a thickness of 2.0~2.5mm.
3.2 Rolling Product Specifications and Dimensions
Serial Number | Specs | Note | ||
1 | C2.5×41×62 | |||
2 | C2.0×41×62 | |||
3 | C2.5×41×52 | |||
4 | C2.0×41×52 | |||
5 | C2.5 X 41X 41 | |||
6 | C2.5×41×41 | |||
7 | C2.5×41×72 | |||
8 | C2.0×41×72 | |||