Huanggang Annual Fire Electrical Inspection, Building Fire Protection Inspection Institution_SupplyPro Co., Ltd._Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd.

Construction engineering and construction, construction quality inspection, i...

15102765896

Huanggang Annual Fire Electrical Inspection, Building Fire Protection Inspection Institution

产品Price Negotiable

最小起订Quantity:1 Piece 供货总Quantity: 20000 Piece

用手机扫描二维码直达商品手机版
MobileView details
Location:
Hubei/Wuhan
有效期至:
长期有效
最后更新:
2023-04-24 13:53
Product Details

We boast experienced fire and electrical inspection technicians equipped with comprehensive fire detection equipment. We are capable of undertaking a variety of fire detection projects, including fire alarm systems, sprinkler systems, fire hydrant systems, and smoke exhaust systems, to meet our clients' needs.
Fire protection facilities
1. The indoor and outdoor fire water supply of school buildings shall comply with the relevant provisions of "Code for Fire Prevention Design" G016-2014 or "Technical Code for Fire Water Supply and Fire Hydrant System."
2. Install fire automatic alarm, automatic extinguishing, emergency lighting, and evacuation sign indicators in accordance with the requirements of the "Code for Fire Prevention in Building Design" G016-2014.
3. Portable fire extinguishers should be placed in easily accessible and clearly visible locations on each floor of the teaching buildings and student dormitories, as well as in the kitchen operations area and library reading rooms.
4. It is advisable to install a leakage fire alarm system in the student dormitory building.
5. For buildings where the fire protection facilities have already passed the fire design review and been deemed qualified, the fire renovation should adhere to the original review and acceptance opinions of the building.

Which projects require a fire inspection upon completion?
Pursuant to the "Regulations for Fire Supervision and Administration of Construction Projects" (Order No. 119), for places with a high concentration of people that fall under any of the following circumstances, the construction unit shall apply for fire design review and fire acceptance after completion:
Sports venues, auditoriums, public exhibition halls, and museum display halls with a total floor area exceeding 20,000 square meters.
2. Civil airport terminal buildings, passenger station waiting rooms, and ferry terminal waiting halls with a total floor area exceeding 15,000 square meters.
3. Hotels, restaurants, shopping malls, and markets with a total floor area exceeding 10,000 square meters.
4. Movie theaters with a total floor area exceeding 2,500 square meters, reading rooms in public libraries, commercial indoor fitness and leisure facilities, university teaching buildings, libraries, and canteens, labor-intensive industrial production and processing workshops, temples, and churches.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15102765896

Back to Top