Tenyan Annual Fire Protection Equipment Inspection, Building Fire Protection Inspection Agency_SupplyPro Co., Ltd._Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hubei Province Precision Engineering Construction Quality Inspection Co., Ltd.

Construction engineering and construction, construction quality inspection, i...

15102765896

Tenyan Annual Fire Protection Equipment Inspection, Building Fire Protection Inspection Agency

产品Price Negotiable

最小起订Quantity:1 Piece 供货总Quantity: 20000 Piece

用手机扫描二维码直达商品手机版
MobileView details
Location:
Hubei/Wuhan
有效期至:
长期有效
最后更新:
2023-04-24 13:55
Product Details

Prior to the commencement of use and operation in public gathering places, fire inspections should be conducted to check the following:
(1) Whether buildings or locations have passed fire inspection and received approval in accordance with laws, or have qualified in the fire review of completion acceptance or random inspection of fire record review; and whether buildings or locations that have conducted fire record review for completion acceptance but not undergone random inspection meet the fire technical standards.
(II) Has a fire safety system, fire extinguishing plan, and emergency evacuation plan been established?
(3) Are the operators of the automatic fire protection system certified and have employees received pre-job fire safety training?
(4) Are fire protection facilities and equipment in compliance with fire technical standards and in good working order?
(Five) Are the evacuation routes, exits, and fire lanes clear and accessible?
(Six) Compliance of interior decoration materials with fire technical standards.
(7) Are there any obstructions on the exterior doors and windows that could hinder evacuation and fire rescue operations?

What projects require a fire inspection upon completion?
In accordance with the "Regulations for Fire Supervision and Management of Construction Projects" (Order No. 119), for places with a high concentration of people that fall under any of the following circumstances, the construction unit shall apply for fire design review and fire acceptance after completion:
1. Sports facilities and auditoriums with a total floor area exceeding 20,000 square meters, public exhibition halls, and museum display areas.
2. Civil airport terminal buildings, passenger train station waiting rooms, and ferry terminal waiting halls with a total floor area exceeding 15,000 square meters.
3. Hotels, restaurants, shopping malls, and markets with a total floor area exceeding 10,000 square meters.
4. Movie theaters with a total floor area exceeding 2,500 square meters, reading rooms in public libraries, commercial indoor fitness and leisure facilities, university teaching buildings, libraries, and dining halls, labor-intensive industrial production and processing workshops, temples, and churches.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15102765896

Back to Top