Tangshan Jinluchuang Paint Co., Ltd.VIP

无机富锌底漆,聚氨酯面漆,环氧云铁中间漆,溶剂型漆,水性漆
Enter Shop

Epoxy Iron Oxide Intermediate Paint

平台认证
  • Unit Price

    Negotiable

  • Brand

    Jinlu River

  • MOQ

    10piece

Contact
Leave Msg

Platform Service

Supplier Verified



唐山金禄川涂料有限公司

VIP   采商通第2年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Jinlu River

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ10piece

  • Total:

    1000piece

  • Address:

    HebeiTangshan

  • Delivery:

    0Hours

  • View More

Description

Product Introduction:The paint is composed of aliphatic hardener, pigment, additives, solvents, etc. It boasts excellent outdoor durability, good mechanical strength, and decorative properties, suitable for surface coating on outdoor steel structures, large-scale machinery equipment, etc., serving both decorative and protective functions.
Features:Two-component, two-can kit, self-drying at room temperature, also quick-drying at low temperatures. Good film adhesion, high hardness. Excellent outdoor durability, good light and color retention, resists yellowing. Rich colors, good resistance to dirt.
Construction Reference:Base Material Treatment: Clean oil stains and rust from the surface of the base material, then perform phosphatization or sandblasting to dry the base material, ensuring it is free of any other chemical impurities.
Spray painting: One coat of iron red undercoat and one coat of topcoat, or two coats of topcoat, suitable for smooth and flat surfaces.
Iron red primer + intermediate coat + top coat, suitable for rougher surfaces with high requirements.
Epoxy zinc-rich primer and topcoat, applied in two coats each, suitable for corrosion resistance and high decorative requirements on the surface.
Dipainting: Open the paint can, mix thoroughly. Add the hardener to the paint according to the ratio and mix well. Dilute with the recommended thinner to achieve the spraying viscosity, then filter and set aside.
Coating: Per general spraying methods. Dry film thickness: Primer 30-40 micrometers, topcoat 40-80 micrometers, coating interval 2-5 hours. After the topcoat is applied, allow to dry for 5-7 days before stacking.
Note:
(1) Estimate the paint quantity needed for this application, mix only as much as required, and use it within 8 hours. Failure to do so may result in a decline in paint quality, potentially leading to gelation and disposal.
(2) Paint and hardener should be mixed in the prescribed ratio; do not estimate and add roughly, as it will severely affect the film quality.
(3) The entire painting process must avoid moisture; the base material must be dry. Compressed air should be filtered and dehumidified, and the air compressor should be drained regularly. Rain, fog, and cold, humid weather are not conducive to the curing of the paint film.
(4) The film reaches surface dry in 0.5 hours at room temperature, fully dry in 24 hours, and requires 7 days for curing to achieve good film condition.
This product should be kept away from fire and heat sources when stored, placed in a cool, dry, and well-ventilated area, with a shelf life of 1 year.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiTangshan
Stock 1000pieceMOQ10piece
Brand Jinlu River
Composition Aliphatic curing agents, pigments, additives, solvents
Features Outdoor durability, excellent mechanical strength
Application Widespread
Expiry Long Valid
Update 2025-03-10 11:47
Gallery

Tangshan Jinluchuang Paint Co., Ltd.Published byEpoxy Iron Oxide Intermediate PaintGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top