Jining Shengxin Construction Engineering Co., Ltd.VIP

绳锯切割施工队伍_混凝土切割施工队伍_楼房墙体切割施工队伍
Enter Shop

Professionally handles nationwide broken pile construction - Skilled team

平台认证
  • Unit Price

    $99.00/Unit

  • Brand

    Shengxin Construction Engineering

  • MOQ

    1Unit

Contact
Leave Msg

Platform Service

Supplier Verified



济宁晟鑫建筑工程有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Shengxin Construction Engineering

  • Unit Price:

    $99.00 / Unit

  • MOQ:

    MOQ1Unit

  • Total:

    9999Unit

  • Address:

    ShandongJining

  • Delivery:

    3days

  • View More

Description


New technology for pile head removal, significant advantages

The advantages of this process: The concrete pile head and the main reinforcement do not bond together, allowing for the quick removal of the pile head after excavation without剥离 the steel and concrete, significantly speeding up the pile head removal process and reducing construction costs.

(1) Convenience and speed: Easy to operate, with minimal accessories, and easy for construction personnel to adopt, quickly becoming proficient in handling.

(2) Cost-effectiveness: Reduces equipment and personnel investment, greatly improves the efficiency of pile head breaking, and lowers construction costs.

(3) Safety and Quality: The pile head rebar is protected by a PE sleeve board, making it easy to separate the pile head concrete from the rebar during pile head removal, thus ensuring the pile foundation rebar is not damaged, guaranteeing the quality of the pile foundation rebar.

(4) Post-pier foundation top surface smooth and aesthetically pleasing.


Hydraulic pile breaker is driven by hydraulic power, utilizing the power from excavators or hydraulic stations to break piles. Modular in design, it efficiently breaks concrete pile caps.

Performance Features:

1. Simple

Modular structure, easy installation, equipped with different numbers of modules based on pile diameter.

2. General

Hydraulic pile breakers can be powered by excavators or by a hydraulic power station.

3. Eco-friendly

Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.

4. Low labor costs

Primarily operated by a single excavator driver, an additional supervisor can be provided.

5. Safety

Construction personnel are excavator operators; they do not directly contact the broken piles.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $99.00 / Unit
Sales None
Delivery ShandongJining3dayswithin
Stock 9999UnitMOQ1Unit
Brand Shengxin Construction Engineering
Swivel Angle
Drilling Depth 32 meters
Boring diameter 24
Expiry Long Valid
Update 2025-02-27 19:18
Gallery

Jining Shengxin Construction Engineering Co., Ltd.Published byProfessionally handles nationwide broken pile construction - Skilled teamGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top