Jining Shengxin Construction Engineering Co., Ltd.VIP

绳锯切割施工队伍_混凝土切割施工队伍_楼房墙体切割施工队伍
Enter Shop

Professional Breakaway Stinger Crew

平台认证
  • Unit Price

    $99.00/Set

  • Brand

    Shengxin Construction Engineering

  • MOQ

    1Set

Contact
Leave Msg

Platform Service

Supplier Verified



济宁晟鑫建筑工程有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Shengxin Construction Engineering

  • Unit Price:

    $99.00 / Set

  • MOQ:

    MOQ1Set

  • Total:

    9999Set

  • Address:

    ShandongJining

  • Delivery:

    3days

  • View More

Description

New technology for pile head removal - significant advantages

The advantages of this process: The concrete at the pile head does not bond with the main reinforcement, allowing for a quick removal of the pile head without stripping钢筋 and concrete after the excavation of the foundation pit, significantly speeding up the pile head removal process and reducing construction costs.

(1) Convenience and speed: Easy to operate, with minimal accessories, construction personnel easily adapt, and can quickly become proficient.

(2) Economic Efficiency: Reduces equipment and personnel investment, greatly enhancing the efficiency of pile head breaking and lowering construction costs.

(3) Safety and Quality: The pile head rebar is protected by a PE sleeve board, which allows for easy separation of the pile head concrete from the rebar during pile head breaking, ensuring that the pile foundation rebar remains undamaged and guarantees the quality of the pile foundation rebar.

(4) The pile foundation top surface is smooth and aesthetically pleasing after removal.



Hydraulic pile breakers are powered by hydraulic systems, utilizing the power from excavators or hydraulic stations to break piles. They feature modular assembly and are highly efficient in breaking cast-in-place pile heads.

Performance Features:

1. Simple

Modular structure, easy installation, equipped with different numbers of modules according to pile diameter.

2. General

Hydraulic pile breakers can be powered by excavators or by hydraulic power units.

3. Eco-friendly

Fully hydraulic drive, low noise, static pressure construction, without affecting pile quality.

4. Low labor costs

Primarily operated by a single excavator driver, an additional supervisor can be provided.

5. Safety

Construction personnel are excavator operators; they do not directly contact broken piles.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $99.00 / Set
Sales None
Delivery ShandongJining3dayswithin
Stock 9999SetMOQ1Set
Brand Shengxin Construction Engineering
Swivel Angle
Boring Depth 32 meters
Drilling Diameter 24
Expiry Long Valid
Update 2025-02-27 19:18
Gallery

Jining Shengxin Construction Engineering Co., Ltd.Published byProfessional Breakaway Stinger CrewGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top