New technology for pile head removal - significant advantages
The advantages of this process: The concrete pile cap and main reinforcement do not bond together, allowing for the quick removal of the pile cap after excavation without the need for stripping钢筋 and concrete, significantly speeding up the pile cap removal process and reducing construction costs.
(1) Convenience and Speed: Easy to operate, minimal auxiliary equipment, easily accepted by construction personnel, and quickly mastered.
(2) Economic Efficiency: Reduces equipment and personnel investment, significantly improving the efficiency of pile head destruction, and lowering construction costs.
(3) Safety and Quality: The pile head reinforcement is protected by a PE sleeve board, making it easy to separate the pile head concrete from the reinforcement during pile head removal, thereby preventing damage to the pile foundation reinforcement and ensuring the quality of the pile foundation reinforcement.
(4) After breaking, the pile foundation top surface is smooth and aesthetically pleasing.
Hydraulic pile breakers are powered by hydraulic systems, utilizing the power from excavators or hydraulic stations to break piles. Modularly designed, they efficiently break cast-in-place pile heads.
Performance Features:
1. Simple
Modular structure with simple installation, equipped with different numbers of modules based on pile diameter.
2. Universal
The hydraulic pile breaker can be powered by the excavator or by a hydraulic power station.
3. Eco-friendly
Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.
4. Low labor costs
Primarily operated by a single excavator operator, an additional supervisor can be provided.
5. Safety
Construction personnel are excavator operators; they do not directly contact broken piles.