Jining Shengxin Construction Engineering Co., Ltd.VIP

绳锯切割施工队伍_混凝土切割施工队伍_楼房墙体切割施工队伍
Enter Shop

Professional Baling Head Removal Team

平台认证
  • Unit Price

    $99.00/Set

  • Brand

    Shengxin Construction Engineering

  • MOQ

    1Set

Contact
Leave Msg

Platform Service

Supplier Verified



济宁晟鑫建筑工程有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Shengxin Construction Engineering

  • Unit Price:

    $99.00 / Set

  • MOQ:

    MOQ1Set

  • Total:

    9999Set

  • Address:

    ShandongJining

  • Delivery:

    3days

  • View More

Description

New technology for pile head removal, significant advantages

The advantages of this process: The concrete pile head and the main reinforcement do not bond together. After excavation of the foundation pit, there is no need for stripping operations of steel and concrete when chiseling off the pile head, significantly speeding up the chiseling process and reducing construction costs.

(1) Convenience and Speed: Easy to operate, with minimal auxiliary equipment, easily accepted by construction personnel, and quickly mastered.

(2) Cost-effectiveness: Reduces the investment in equipment and personnel, greatly improves the efficiency of pile head breaking, and lowers construction costs.

(3) Safety and Quality: The pile head rebar is protected by a PE sleeve board, which allows for easy separation of the pile head concrete from the rebar during pile head breaking, ensuring that the pile foundation rebar remains undamaged and guarantees the quality of the pile foundation rebar.

(4) The pile foundation top surface is smooth and aesthetically pleasing after breaking.



Hydraulic pile breaker, powered by hydraulic systems, breaks piles using the power of excavators or hydraulic stations. Modularly combined, it efficiently breaks through cast-in-place pile heads.

Performance Features:

1. Simple

Modular structure, easy installation, with different numbers of modules available based on pile diameter.

2. Universal

The hydraulic pile breaker can be powered by the excavator or by a hydraulic power station.

3. Eco-friendly

Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.

4. Low labor costs

Primarily operated by a single excavator driver, an additional supervisor can be provided.

5. Safety

The construction personnel are the excavator operators, who do not come into direct contact with the broken piles.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $99.00 / Set
Sales None
Delivery ShandongJining3dayswithin
Stock 9999SetMOQ1Set
Brand Shengxin Construction Engineering
Rotation Angle
Boring Depth 32 meters
Boring Diameter 24
Expiry Long Valid
Update 2025-02-27 19:18
Gallery

Jining Shengxin Construction Engineering Co., Ltd.Published byProfessional Baling Head Removal TeamGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top