Longze Shunda (Beijing) Fire Protection Technology Co., Ltd.VIP

消防维保、消防改造、装修材料防火检测、厨房灭火装置等。
Enter Shop

How to conduct electrical consumption inspections at the Xicheng shopping mall in Beijing? How to perform the electrical inspection at Miyun?

平台认证
  • Unit Price

    $1.00/Piece

  • Brand

    Longze Shunda

  • MOQ

    1Piece

Contact
Leave Msg

Platform Service

Supplier Verified



龙泽顺达(北京)消防科技有限公司

VIP   数字营销第2年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Longze Shunda

  • Unit Price:

    $1.00 / Piece

  • MOQ:

    MOQ1Piece

  • Total:

    9999Piece

  • Address:

    Beijing

  • Delivery:

    0Hours

  • View More

Description

Our company is a comprehensive fire protection provider specializing in building fire facility inspections, electrical fire detection, fire detector cleaning, fire protection maintenance and engineering renovations, as well as wholesale of fire equipment.
Methods for Testing Automatic Sprinkler Fire Protection Systems
Testing Method for Wet Systems
1) Turn on the trial water device at the end of the adverse section, check the pressure gauge; inspect the operation and feedback signals of the water flow indicator, pressure switch, and fire pump.
2) Measure the time from the opening of the trial water device at the end to the operation of the fire pump.
3) Measure the hydraulic shock intensity with a sound level meter.
4) The system is back to normal.
Testing Methods for Dry Systems
1) Open the control valve of the trial water device at the end of the disadvantageous section, inspect the operation and feedback signals of the water flow indicator, pressure switch, fire pump, and electric valve, as well as the exhaust condition of the exhaust valve.
2) Measure the time from the start of the water test device at the end of the opening to the water pressure reaching 0.05 MPa.
3) System is back to normal.
Pre-action system testing methods
1) Subsequently activate two fire detectors within the protection zone, inspect the operation and feedback signals of the solenoid valve, electric valve, fire pump, flow indicator, pressure switch, as well as the exhaust valve's exhaust status.
2) Activate the end-of-line water testing device 2 minutes after the alarm, and measure the water pressure.
3) Measure the hydraulic impact value using a sound level meter.
4) System is back to normal.
Method for Testing Rainwater Systems
1) Parallel setup of multiple deluge valves system, verify the logical relationship for controlling the deluge valves.
2) Activate two fire detectors within the protective zone sequentially or due to pressure relief in the transmission pipe. Inspect the actions and feedback signals of the solenoid valve, fire pump, and pressure switch.
3) Measure the hydraulic pressure with a sound level meter.
4) For locations where actual water spray is not recommended, the rainproof valve outlet control valve should be tightly closed prior to testing.
5) The system has been restored to normal.
One, the inspected party should pre-arrange the content, time, and area of the inspection and sign an inspection agreement.
Two, the inspected party shall provide relevant documents, such as drawings, acceptance of construction projects (fire review opinions), concealed work records, etc.
Three, the inspector shall not operate the inspected facility in principle, and must do so with the cooperation of the inspected party's personnel when necessary.
Four, if the inspected party has any objections to the test results, they may conduct a retest on-site. Sign the test record upon confirmation.
Within three business days after the inspection is completed, a test report will be issued.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $1.00 / Piece
Sales None
Delivery Beijing
Stock 9999PieceMOQ1Piece
Brand Longze Shunda
Service Inspection and Electric Testing
Category Fire and electrical inspection
Specs Electrical Inspections / Electrical Testing
Expiry Long Valid
Update 2024-10-26 15:08
Gallery

Longze Shunda (Beijing) Fire Protection Technology Co., Ltd.Published byHow to conduct electrical consumption inspections at the Xicheng shopping mall in Beijing? How to perform the electrical inspection at Miyun?Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top