The hoarding project is primarily designed to isolate the construction site from the external environment, ensuring the site remains a relatively enclosed space for the sake of construction safety and to minimize environmental impact. Below are the construction steps for the hoarding project.
1. Pre-construction preparation:Including on-site surveys, design plan development, and preparation of materials and equipment.
2. Construction Area Preparation:Clear obstructions from the construction area to ensure it is level.
3. Hoarding InstallationAssemble and install the hoarding based on the design plan, ensuring its stability and verticality.
4. Retaining Wall ReinforcementSet supports at the corners and center of the hoarding and install fasteners between the hoarding and supports to enhance the stability of the hoarding.