Hubei Kangshang Construction Engineering Co., Ltd.VIP

强夯,强夯置换
Enter Shop

Factory Compaction

平台认证
  • Unit Price

    $1.00/Item

  • Brand

    Kangshang Construction

  • MOQ

    1Item

Contact
Leave Msg

Platform Service

Supplier Verified



湖北康尚建设工程有限公司

VIP   标王第2年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Kangshang Construction

  • Unit Price:

    $1.00 / Item

  • MOQ:

    MOQ1Item

  • Total:

    99999Item

  • Address:

    HubeiWuhan

  • Delivery:

    0Hours

  • View More

Description

Kangshang Construction Engineering Co., Ltd. is a professional contractor specializing in deep compaction and deep compaction replacement for soft foundation treatment. The company owns over 30 sets of new hydraulic deep compaction equipment, capable of undertaking projects ranging from 1000kn.m to 20,000kn.m in deep compaction and deep compaction replacement. Our services are nationwide, with thousands of successful construction cases. The company's management and technical team are among the earliest builders in the field, having gained high recognition and a good reputation through years of exploration and practice. We have received positive feedback and recognition from a wide range of clients, gradually evolving into a brand company with strong equipment, technical, and management capabilities in foundation construction!


The main advantages of the dynamic compaction method include: wide application range, significant reinforcement effect, large effective reinforcement depth, simple construction equipment, material savings, cost savings, and environmental friendliness.

(1) Application Scope: Compaction method can be used to reinforce various sandy soils, silt soils, general clay soils, loess, artificial fills, especially suitable for reinforcing large-sized gravelly soils that are difficult to reinforce by general methods, as well as mixed fills composed of shallow, domestic waste, or industrial waste. The replacement method can also be employed to reinforce soft soil foundations.

(2) Enhanced Reinforcement Effect: After the foundation is treated with dynamic compaction, it can significantly improve the shear strength and bearing capacity of the soil, and reduce its compressibility.

(3) Construction equipment simple: The main equipment for dynamic compaction is crawler cranes. Substitute dynamic compaction equipment can be used with gantry frames and other facilities when necessary to enhance lifting capacity and stability.

(4) Material Savings: Compared to other foundation treatment methods, the dynamic compaction method does not require steel, cement, and other construction materials, which can significantly reduce the consumption of construction materials.

(5) Cost-Effective: The dynamic compaction method is economically advantageous compared to commonly used foundation treatment processes, with a cost that is only 1/6 of CFG piles, 1/10 of mixing piles, and 1/2 of lime-soil piles.

(6) Eco-friendly: The compaction method used in construction does not consume materials like steel and cement, which are high-energy consumers, and it also does not pollute the surrounding environment.

The main drawback of the dynamic compaction method is that it generates significant vibration and noise during construction, which can impact surrounding buildings, structures, and the environment.



The dynamic compaction method is suitable for treating foundations such as crushed soil, sandy soil, low-saturation silt and clay, collapsible loess, unconsolidated fill, and mixed fill. The treated foundation not only enhances the strength of the soil but also reduces its compressibility, while also improving its resistance to vibration-induced liquefaction. Therefore, the dynamic compaction method is often used for treating foundations of liquefiable sandy soil, etc.


The compacting method is simple to operate, has a wide range of soil applicability, and demonstrates significant reinforcement effects, allowing for higher bearing capacity. The general foundation strength can be increased by 2 to 5 times; the deformation settlement is minimal, with compressibility reduced by 2 to 10 times; soil particles are tightly bound, providing high structural strength; high efficiency with rapid construction speed, cutting the construction period in half compared to soil replacement and backfilling; saves reinforcement materials; low construction costs, reduces investment; saves 60% of costs compared to soil replacement and backfilling, and 50% to 70% of investment compared to precast pile reinforcement, and 40% to 50% compared to sand piles.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $1.00 / Item
Sales None
Delivery HubeiWuhan
Stock 99999ItemMOQ1Item
Brand Kangshang Construction
Company Kangshang Construction Engineering
Is negotiation possible? Negotiable
Service Support On-site survey
Expiry Long Valid
Update 2024-03-25 16:22
Gallery

Hubei Kangshang Construction Engineering Co., Ltd.Published byFactory CompactionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top