Sinoyi Group (Glass) Co., Ltd. is a major glass production enterprise. This project is divided into two phases with an investment of approximately 3 billion yuan. The project is located in Tieshan District, Beihai City, Guangxi Province, covering over 2000 acres. We are entrusted by them to undertake the foundation work for this project.
4.2.1 Foundation Point Layout Plan
Drive home the point 6.0×6.0m 梅花pattern arrangement, compaction energy of 3000 kN·mThe ramming锤 and height increase should be determined based on the ramming energy; the successful consolidation depth is 6.0 meters.
(1) The hammering points can be arranged in a plum blossom pattern, with a 6m x 6m plum blossom pattern layout; one round of hammering points are spaced 6 meters apart; the second round of hammering points should be located at the center of the square.
(2) Pounding Passes: 2 passes, each pounding point is temporarily set for 4-6 strikes; the standard for picking up the hammer: the average settlement of the last two pounding strikes is not more than 100mm.
(3) Full Compaction Passes: 1 pass; Full Compaction Impact Energy: 1000 KN.m; Full Compaction Joints: 1/3 overlap.(1) Compaction testing
During the early stages of the project, the company's chairman personally took charge of organizing the project's commencement, and the client representative gave our construction preparations high praise.