Suzhou Shunze Tong Electromechanical Installation Co., Ltd.VIP

各类管道安装,桥架及电气安装,环保项目及设备安装,厂房搬迁
Enter Shop

Air Compressor Pipeline Installation Company - Kunshan Air Compressor Installation - Shunzetong Electrical and Mechanical Installation Company

平台认证
  • Unit Price

    $999.00/piece

  • Brand

    ShunzeTong Electromechanical

  • MOQ

    1piece

Contact
Leave Msg

Platform Service

Supplier Verified



苏州顺泽通机电安装有限公司

VIP   数字营销第3年
资料通过中商114认证
Category
  • No Category
Recommend

Product Details

Specs

Gallery

  • Brand:

    ShunzeTong Electromechanical

  • Unit Price:

    $999.00 / piece

  • MOQ:

    MOQ1piece

  • Total:

    99999piece

  • Address:

    JiangsuSuzhou

  • Delivery:

    3days

  • View More

Description






Upon completion of pipeline installation, an integrity check is typically conducted to ensure no leaks are present. Some checks are based on PID diagrams, while others rely on single-line diagrams. I personally prefer using PID diagrams as there are too many single-line diagrams and they are cumbersome to handle. After the integrity check is cleared, the next step is to conduct a pressure test or an air-tightness test. The pressure test usually involves hydrostatic testing, with pneumatic testing being less common, though it does occur. However, safety measures must be strictly followed as pneumatic testing is extremely dangerous, and any safety incidents could be severe. The test pressure for the pressure test is generally 1.5 times the design pressure. It should be noted that the pressure for hydrostatic testing is definitely greater than the design pressure, which in turn is larger than the pipeline's maximum working pressure, which is greater than the normal working pressure of the pipeline. These considerations are all based on safety, ensuring that pipeline safety is generally guaranteed. Air-tightness tests are usually performed on gas pipelines, involving the application of soap water to welds or flange connections to check for bubbles. The gas used is typically air or nitrogen.





Suzhou Shunze Tong Electromechanical Installation Co., Ltd. was established in September 2013, located at No. 12 Datong Road, Suzhou High-tech Industrial Development Zone. Our company specializes in the installation of various pipelines and equipment. In recent years, we have assisted the environmental protection industry in completing over 200 pollution control projects, including wastewater and waste gas treatment as well as soil remediation, earning high praise from our clients and establishing long-term cooperative agreements.

Pipe Installation

When installing seamless steel pipe pipelines, the longitudinal seams should be positioned where they are easily accessible during hydrostatic testing. Pipelines that pass through floors, walls, foundations, railways, and highways should be fitted with protective sleeves, and pipe sections inside should generally not have welds. If welds are unavoidable, they should be pressure tested and approved before installation. The gap between the steel pipe and the sleeve should be filled with insulating material.







Suzhou Shunze Tong Electromechanical Installation Co., Ltd. specializes in the installation of various pipelines and equipment. In recent years, we have assisted the environmental protection industry in completing over two hundred pollution control projects, including wastewater and air emissions treatment, as well as soil remediation. Our air compressor installations in Kunshan have received high praise from clients and led to long-term cooperative agreements.

Pipe Installation - Measurement of Pipe Slope

Measurement of pipe gradient: Place a flat iron on the pipe, lift one end until the bubble is centered, then measure the height of the iron lifted above the pipe. Divide this height by the length of the iron level to obtain the gradient value of the pipe. The gradient direction is towards the end lifted by the iron level.







Air Compressor Installation Company - Kunshan Air Compressor Installation - Shunzetong Electrical and Mechanical Installation Co., Ltd. provided by Suzhou Shunzetong Electrical and Mechanical Installation Co., Ltd. Journeying Far, Striving Forward. Suzhou Shunzetong Electrical and Mechanical Installation Co., Ltd. is committed to becoming a strategic partner that wins together, grows together, and progresses together with you. We are determined to be a competitive industrial maintenance and installation enterprise, soaring with you and achieving success together!

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $999.00 / piece
Sales None
Delivery JiangsuSuzhou3dayswithin
Stock 99999pieceMOQ1piece
Brand ShunzeTong Electromechanical
Manufacturer ShunzeTong Electromechanical
Is negotiation possible? Negotiable
Sample Support Negotiable
Expiry Long Valid
Update 2024-01-04 10:38
Gallery

Suzhou Shunze Tong Electromechanical Installation Co., Ltd.Published byAir Compressor Pipeline Installation Company - Kunshan Air Compressor Installation - Shunzetong Electrical and Mechanical Installation CompanyGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top