Suzhou Shunze Tong Electrical and Mechanical Installation Co., Ltd.VIP

各类管道安装,桥架及电气安装,环保项目及设备安装,厂房搬迁
Enter Shop

Which bridge support installation is the best - Wujiang Bridge Support Installation - Shunzetong Electromechanical Installation Co., Ltd.

平台认证
  • Unit Price

    $999.00/piece

  • Brand

    ShunzeTong Electrical and Mechanical

  • MOQ

    1piece

Contact
Leave Msg

Platform Service

Supplier Verified



苏州顺泽通机电安装有限公司

VIP   数字营销第3年
资料通过中商114认证
Category
  • No Category
Recommend

Product Details

Specs

Gallery

  • Brand:

    ShunzeTong Electrical and Mechanical

  • Unit Price:

    $999.00 / piece

  • MOQ:

    MOQ1piece

  • Total:

    99999piece

  • Address:

    JiangsuSuzhou

  • Delivery:

    3days

  • View More

Description






Cable Tray Installation Requirements

1. The bottom of the bridge beam should not be less than 2.2m from the ground, the top should not be less than 0.3m from the floor, the distance from the beam should not be less than 0.05m, and the spacing between the bridge beam and power cables should not be less than 0.5m.

2. When bridge channels are parallel or intersect with various pipelines, their minimal clear distance should comply with the national standard "Code for Acceptance of Construction Quality of Electrical Installation Engineering" GB 50303—2002, specifically Article 12.2.1 and Table 12.2.1-2.

3. Fireproof seals should be installed in bridgeways and pipeline openings within vertical shafts and across different fire divisions.

4. Elbows, tees, and other fittings should be purchased as pre-fabricated products from bridge manufacturer, rather than being made on-site.








SuZhou ShunZeTong Electromechanical Installation Co., Ltd. was established in September 2013, located at No. 12 Datong Road, Suzhou High-tech Industrial Development Zone. Our company specializes in the installation of various pipelines and equipment. In recent years, we have assisted the environmental protection industry in completing over two hundred pollution treatment projects, including wastewater and waste gas treatment, as well as soil remediation. Our bridge installation services in Wujiang have received high praise from customers and led to long-term cooperative agreements. We also undertake the installation and long-term maintenance of pipelines, electrical systems, and equipment in various factories, and have become a long-term, high-quality supplier to several foreign enterprises. Our bridge installation projects have accumulated a strong customer base and earned us a good reputation.


Cable tray installation requirements and specification guidelines


Establish Direction: Based on the architectural floor plan, consider the layout of air conditioning and electrical piping, ease of maintenance, bridge installation costs, and cable routing density to determine the optimal route for cable trays. Indoors, install along the walls, columns, beams, and floors of the building as much as possible. If utilizing a utility tunnel, parallel installation should be considered on one side or above the pipes, and efforts should be made to avoid crossings of downlines and branch lines. If no other pipe racks are available, self-established (support) columns are required.







Suzhou Shunze Tong Electromechanical Installation Co., Ltd. was established in September 2013, located at No. 12 Datong Road, Suzhou High-tech Industrial Development Zone. Our company specializes in the installation of various pipelines and equipment. In recent years, we have assisted the environmental protection industry in completing over two hundred pollution control projects, including wastewater and air pollution treatment as well as soil restoration. We have received unanimous praise from our clients and have entered into long-term cooperative agreements with them.

Cable tray installation and construction process

Bridgeway installation


1. The bridge channel's right-angle bends, tees, and crosses should use the manufacturer's corresponding components; the construction unit should not make themself. The bridge channel cover plate should have no tilt, and the joints should be tight and neat.

2. Fire-resistant isolation measures should be taken when cable trays pass through fire walls and fire-rated floors.







Bridgeway Installation - Wujiang Bridgeway Installation - Shunzetong Electrical and Mechanical Installation Co., Ltd. 2, provided by Suzhou Shunzetong Electrical and Mechanical Installation Co., Ltd. Shunzetong Electrical and Mechanical has dedicated much enthusiasm and passion to the field of industrial maintenance and installation. We always prioritize our customers and aim to create value for them, winning the market with quality and service. We sincerely hope to cooperate with all sectors of society to achieve success and brilliance together. For related business inquiries, please contact Manager Ma.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $999.00 / piece
Sales None
Delivery JiangsuSuzhou3dayswithin
Stock 99999pieceMOQ1piece
Brand ShunzeTong Electrical and Mechanical
Manufacturer ShunzeTong Electrical and Mechanical
Is negotiation possible? Negotiable
Sample Support Negotiable
Expiry Long Valid
Update 2024-01-04 10:38
Gallery

Suzhou Shunze Tong Electrical and Mechanical Installation Co., Ltd.Published byWhich bridge support installation is the best - Wujiang Bridge Support Installation - Shunzetong Electromechanical Installation Co., Ltd.Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top