Guangdong Shijia Gujian Building Materials Technology Co., Ltd., equipment foundation installation grout, steel structure column base plate installation grout, wind power equipment foundation installation grout
GROUTING MATERIAL FEATURES: Early strength, high strength, large fluidity (self-leveling), shrinkage-free
Early strength, high strength: The strength can reach over 60MPa in a day, and the equipment can be put into production operation the day after installation is completed.
2. Self-Flowing: Simply add water, mix, and pour directly into the equipment foundation. No vibration is required to fill all the voids in the foundation.
3. Micro expansion: To ensure tight contact between the equipment and the foundation.
4. Rust-inhibitive: No rusting effect on reinforcing steel, steel plates, etc.
5. Oil Resistance: After soaking in engine oil for 30 days, its strength increases by more than 10% compared to before soaking.
Durability: After 30 fatigue tests and 50 freeze-thaw cycles, there is no significant change in strength.
7. Excellent weather resistance - safe for long-term use at temperatures ranging from -40℃ to 600℃.
8. Crack Resistance: Cracking may occur during on-site use due to uncertain water addition, unpredictable environmental temperatures, and limitations in maintenance conditions.
Grouting material applications
Grouting materials are primarily used for: anchoring of foundation bolts, emergency repairs of airport runways, fixation of nuclear power equipment, reinforcement of road and bridge projects, machine bases, steel structures and foundation sockets, secondary grouting of equipment foundations, embedding of reinforcing bars, reinforcement and renovation of concrete structures, treatment of cracks in old concrete structures, installation of electromechanical equipment, installation of tracks and steel structures, sealing of static pressure pile projects, structural reinforcement, enlargement of beam and column cross-sections, thickening of wall structures and repair of leaks and water seepage, grouting of foundation engineering collapses, and various emergency repair projects.
Grouting material application scope
One-time and second-time grouting for equipment foundations requiring high-precision installation.
Rebar embedding and anchor bolt anchoring for construction and geotechnical engineering.
2. Structural reinforcement and renovation projects, including beam and column joints, expansion joints, and construction joints casting.
3. For emergency repair and construction of roads, bridges, tunnels, airports, etc.
4. Rail tie anchoring construction.
5. Column wet wrapped steel reinforcement for filling angle iron and column gap joints.
Recommended Dosage: Calculate the actual dosage based on the reference dosage of 2.28~2.4 tons per cubic meter.
Packaging and Storage
Packaging specification: 50kg per bag, store in a well-ventilated and dry place, and prevent direct sunlight.
2. Shelf life is 3 months; products must pass a re-inspection and be deemed合格 before use beyond this period.
3. Free of benzene derivatives, halogenated hydrocarbons, formaldehyde, heavy metals, and other harmful components; non-toxic, odorless, pollution-free, and non-irritating.
Non-flammable; may be transported as general cargo.