Guangdong Shijia Gujian Building Materials Technology Co., Ltd.VIP

高强无收缩灌浆料系列、环氧/聚合物砂浆、预应力管道压浆料、混凝土路面修补料、桥梁伸缩缝修补料、界面处理剂、轨道胶泥
Enter Shop

Guangzhou High-Temperature Casting Material, Boiler Installation Reinforcement Grouting Material Wholesale

平台认证
  • Unit Price

    $80.00/piece

  • Brand

    Shi Jia Guojian

  • MOQ

    1piece

Contact
Leave Msg

Platform Service

Supplier Verified



广东士佳固建建材技术有限公司

VIP   数字营销第3年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Shi Jia Guojian

  • Unit Price:

    $80.00 / piece

  • MOQ:

    MOQ1piece

  • Total:

    10000piece

  • Address:

    GuangdongGuangzhou

  • Delivery:

    3days

  • View More

Description

Guangzhou High-Temperature Casting Material, Boiler Installation Reinforcement Grouting Material Wholesaler - Guangdong Shijia Guojian Building Materials Technology Co., Ltd.

Key Products: CGM High-Strength Non-Shrink Grouting Series, CGM-340, CGM-380, Epoxy Grouting, Epoxy Repair Mortar, CGM-320 Support Grouting, Rapid-Fill Gravity Mortar, Seat Grout, CGM High-Strength Rapid Repair Material; High-Strength Polymer Mortar, Epoxy Support Grouting, Polymer Crack-Resistant Mortar, Polymer Waterproofing Mortar, Fast Repair Material for Concrete Pavements, Track Mastic, Concrete Carbonation Inhibitor Coating, Bonding Agent, Prestressed Pipe Grouting Agent, Abrasion-Resistant Floor Hardener, and Product Master Batch...

CGM High-Strength Non-Shrink Grout

Product Features: 1. Early and high strength: 1-day compressive strength ≥ 27 MPa; 3-day compressive strength ≥ 40 MPa; 28-day compressive strength ≥ 60 MPa.

2. slight expansion

Ensure tight contact between the equipment and foundation, with no shrinkage after secondary grouting.

3. High fluidity

Fills all voids, meets the requirements for secondary grouting of equipment.

4. Anti-segregation

Overcame the segregation phenomenon caused by excessive water addition during on-site use.

5. Crack Resistance

Cracking phenomena during on-site use due to uncertain water addition, ambient temperature, and limited curing conditions.

6. Durable

After 500,000 fatigue tests and 50 freeze-thaw cycles, the strength shows no significant change. After soaking in engine oil for 30 days, the strength is notably improved.

7. Suitable for winter construction

Outdoor construction is permitted at temperatures as low as -10°C.

Product Application:

1. Used for secondary grouting of equipment foundations.

2. For anchoring foot bolts and reinforcing bar embedding.

3. For reinforcing and repairing concrete structures.

Technical Specifications:

Pre-construction preparations

1. Mechanical Mixing: Concrete mixer or mortar mixer.

2. Manual Stirring: Several mixing tanks and shovels.

3. Several buckets;

4. Several weighing scales

5. Chute

6. High-position funnels, grouting pipes, and pipe fittings

7. Grouting Propulsion Device

8. Templates (steel molds, wood molds)

9. Burlap bags, rock wool blankets, etc.

10. Cotton yarn, tape;

Grouting construction

Step 1: Basic Processing

The base surface should be roughened. Clean the base surface, ensuring there are no debris such as gravel, slurry, dust, oil stains, and release agents. The base surface should be thoroughly moistened 24 hours before grouting, and any standing water should be cleared 1 hour before grouting.

Step 2: Explore

1. Set up forms according to the grouting construction drawing. Seal the joints between forms and foundation, as well as between forms, using cement grout and tape to ensure the entire form set is watertight.

2. The horizontal distance around the template and base of the equipment should be maintained at about 100mm to facilitate grouting work.

3. The template top elevation should be 50mm higher than the surface of the equipment base.

4. If leakage occurs during grouting, it should be addressed promptly.

Step 3: Grout Mixture Preparation

Generally, add water and mix according to a standard of 13-14% for general reinforced type, and 9-10% for stone aggregate reinforced type.

2. Use mechanical stirring, which typically takes 1-2 minutes (drill mixer use is strictly prohibited). For manual stirring, first mix for 2 minutes with 2/3 of the water, then add the remaining water and stir until uniform.

3. The amount to stir each time should be determined based on the usage, ensuring the material is used up within 40 minutes.

4. Under no circumstances should any admixture or external additive be mixed with CGM grouting material during on-site use.

Step 4: Grouting Construction Method

1. For longer equipment or track foundations, segmented construction should be employed.

2. Illustrations of Common Grouting Methods

3. During the secondary grouting, the following requirements should be met.

1.1 During secondary grouting, the grout should be applied from multiple points on one side or adjacent sides until it overflows from the opposite side, to facilitate air release during the grouting process. Grouting from all four sides simultaneously is not allowed.

1.2 Once grouting begins, it must be conducted continuously without interruption, and the grouting time should be minimized as much as possible.

1.3 Vibration is strictly prohibited during grouting. If necessary, use a grouting booster to push CGM grouting material along the bottom of the grouting layer. It is strictly forbidden to push from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.

1.4 After the equipment foundation grouting is completed, cut at a 45-degree angle outward along the equipment edge 3-6 hours post-grouting (as shown in the image below) to prevent cracks from forming at the ends. If edge cutting is not possible, smooth the surface of the grouting layer with a trowel 3-6 hours after grouting.

When the thickness of the grouting layer exceeds 150mm, use reinforced coarse aggregate high-strength shrinkage-free grouting material.

1.6 When the base grouting volume of the equipment is large, mechanical mixing should be used for the agglomeration reinforcement grouting material to ensure the grouting construction.

Step 5: Maintenance

1. Immediately cover with wet straw or rock wool blankets within 30 minutes after grouting, and maintain moisture.

2. During winter construction, maintenance measures should also comply with the relevant provisions of the current >GB50204.

3. After the grouting material reaches the demolding time, the equipment installation can be carried out. Please refer to the "Demolding and Curing Time and Environmental Temperature Relationship Chart" for the specific time.

4. After the equipment foundation grouting is completed, if there is a need to remove any parts, they can be gently scraped off with a trowel or shovel tool within 3-6 hours after grouting, before the grout layer hardens.

5. Do not transmit vibrations from the running machine to the equipment foundation. After secondary grouting, the machine should be shut down for 24-36 hours to prevent damage to the unset grout layer.

Packaging and Storage

Packaging specification: 50kg/bag, store in a well-ventilated and dry place, and prevent direct sunlight.

Guangxi: Liuzhou, Nanning, Qinzhou, Laibin, Guigang, Chongzuo, Yulin, Guilin, Wuzhou, Baise, Hezhou, Beihai, Hechi, Fangchenggang

Guangdong: Shenzhen, Guangzhou, Shaoguan, Jiangmen, Yunfu, Yangjiang, Zhuhai, Qingyuan, Maoming, Shantou, Foshan, Zhongshan, Huizhou, Meizhou, Dongguan, Zhaoqing, Zhanjiang, Heyuan, Shanwei, Chaozhou, Jieyang

Guangzhou, Yuexiu District, Tianhe District, Baiyun District, Liwan District, Luogang District, Huangpu District, Haizhu District, Panyu District, Huadu District, Nansha District, Zengcheng City, Conghua City

Shenzhen, Luohu District, Futian District, Nanshan District, Bao'an District, Longgang District, Guangming New District, Pingshan New District, Yantian District

Zhuhai, Doumen District, Jinwan District, Xiangzhou District

Shantou, Chaonan District, Chaoyang District, Chenghai District, Haizhu District, Jinping District, Longhu District, Nanao District

Foshan, Chancheng District, Nanhai District, Shunde District, Shunyi District, Gaoming District

Shaozhou, Lechang, Nanyong, Qujiang District, Renhua, Ruyuan, Xisheng, Wengyuan, Wujiang District, Xinfeng, Xianjiang District

Zhanjiang, Chikan District, Leizhou, Lianjiang, Mazhang District, Potou District, Suixi, Wu'chuan, Xiaoshan, Xuwen

Zhaoqing, Deqing, Dinghu District, Duanzhou District, Fengkai, Gaoyao, Guangning, Huaiji, Sihui

Jiangmen, Enping, Heyuan, Jianghai District, Kaiping, Pongjiang District, Taishan, Xinhui District

Maoming, Maogang District, Huazhou, Xinyi, Gaoyou, Dianbai

Huizhou, Huicheng District, Huizhouyao District, Huidong, Boluo, Longmen

Meizhou, Dabu, Fengshun, Jialing, Meijiang District, Meixian, Pingyuan, Wuhua, Xingning

Shantou, City Area, Haifeng, Luofeng, Luhe

Heyuan, Dongyuan, Pinghe, Lianning, Longchuan, Yuanqu, Zijin

Yangjiang, Jiangcheng District, Yangchun, Yangdong, Yangxi

Qingyuan, Fugang, Liannan, Lianshan, Lianzhou, Qingcheng District, Qingxin, Yangshan, Yiding

Dongguan, Duanzhou District, Fengkai, Gaoyao, Guangning, Huaiji, Sihui, Doumen District

Zhongshan, Chaozhou, Chao'an, Raoping, Xiangqiao District

Jieyang, Huilai, Jiedong, Jiexi, Puning, Longcheng District

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $80.00 / piece
Sales None
Delivery GuangdongGuangzhou3dayswithin
Stock 10000pieceMOQ1piece
Brand Shi Jia Guojian
Features High-temperature resistant, corrosion-proof, non-shrinking, self-leveling, self-compacting
Specs 50 kg
Application Scope Boiler installation with high-temperature-resistant foundation reinforcement
Expiry Long Valid
Update 2023-05-11 11:38
Gallery

Guangdong Shijia Gujian Building Materials Technology Co., Ltd.Published byGuangzhou High-Temperature Casting Material, Boiler Installation Reinforcement Grouting Material WholesaleGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top