Guangdong Shijia Gujian Building Materials Technology Co., Ltd.VIP

高强无收缩灌浆料、高强聚合物砂浆、支座灌浆料、环氧树脂砂浆
Enter Shop

Steel column base grouting material installation

平台认证
  • Unit Price

    $990.00/ton

  • Brand

    Shi Jia Construction

  • MOQ

    1ton

Contact
Leave Msg

Platform Service

Supplier Verified



广东士佳固建建材技术有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Shi Jia Construction

  • Unit Price:

    $990.00 / ton

  • MOQ:

    MOQ1ton

  • Total:

    10000ton

  • Address:

    GuangdongGuangzhou

  • Delivery:

    24h

  • View More

Description

Guangzhou High-Strength Grouting Equipment, Grouting Material Manufacturer; Shenzhen Non-Shrink Anchor Grouting Material Manufacturer; Zhuhai Self-Compacting Structural Reinforcement Grouting Material Manufacturer; Main Products:CGM High-Strength Non-Shrink Grouting Series, CGM-340, CGM-380, Epoxy Grouting, Epoxy Patching Mortar, CGM-320 Support Grouting, Rapid-Fill Gravity Mortar, Seat Mortar, CGM High-Strength Emergency Repair Material; High-Strength Polymer Mortar, Epoxy Support Grouting, Polymer Crack-Resistant Mortar, Polymer Waterproof Mortar, Rapid Repair Material for Cement Pavements, Track Mastic, Concrete Carbonation-Resistant Coating, Bonding Agent, Prestressed Pipe Grouting Agent, Abrasion-Resistant Floor Hardener, etc., as well as masterbatch products...

CGM High-Strength Non-Shrink Grouting Material

Product Features1. Early strength, with compressive strength of ≥27 MPa after 1 day; ≥40 MPa after 3 days; and ≥60 MPa after 28 days.

2. Microexpansivity

Ensure tight contact between the equipment and foundation, with no shrinkage after secondary grouting.

3. High fluidity

Fills all voids, meets the requirements for secondary grouting of equipment.

4. Anti-segregation

Overcame the phenomenon of segregation caused by excessive water addition during on-site use.

5. Crack-resistant

Cracking phenomena during on-site use due to uncertain water addition, ambient temperature, and limitations on maintenance conditions.

6. Durable

After millions of fatigue testsNo significant change in strength after 50 freeze-thaw cycles. Strength increased notably after soaking in engine oil for 30 days.

7. Suitable for winter construction

Permitted toOutdoor construction at -10℃ temperatures.

Product Application:

Used for secondary grouting of equipment foundations.

2. For anchoring foot bolts and reinforcing bar embedding.

3. For reinforcement and repair of concrete structures.

Technical Specifications:

Pre-construction preparations

1. Machine Mixing: Concrete mixer or mortar mixer;

2. Manual Stirring: Several mixing basins and shovels

3. Several buckets.

4. Several weighing scales

5. Flow Channels

6. High-position funnels, grouting pipes, and pipe joints

7. Grouting Propeller

8. Templates (steel molds, wooden molds)

9. Burlap bags, rock wool blankets, etc.

10. Cotton yarn, tape;

Grouting construction

Step 1: Basic Processing

The base surface should be roughened. Clean the base surface, ensuring there are no debris, float, loose dust, oil stains, and release agents, etc. Prior to grouting.24 hours, the base surface should be fully moistened; before grouting, remove any standing water 1 hour prior.

Two Steps: Feel and Touch

1. Set up forms according to the grouting construction drawing. Seal the joints between the forms and the foundation, as well as between the forms themselves, using cement grout and tape to ensure the entire form system is waterproof.

2. The horizontal distance around the template and base should be maintained at approximately 100mm to facilitate grouting work.

3. The template's top elevation should be 50mm higher than the surface of the equipment base.

4. In case of leakage during grouting, it should be addressed promptly.

Step 3: Grout Mixture Preparation

Generally, water is mixed according to a standard of 13-14% for general reinforced type, and 9-10% for aggregate reinforced type.

2. Mechanical stirring is used, with a general mixing time of 1-2 minutes (using a drill mixer is strictly prohibited). When mixing manually, first add 2/3 of the water and mix for 2 minutes, then add the remaining water and mix until uniform.

3. The mixing amount should be determined based on the usage quantity to ensure the material is used up within 40 minutes.

4. It is strictly prohibited to add any admixtures or external additives to CGM grouting material during on-site use.

Step 4: Grouting Construction Method

1. For longer equipment or track foundations, segmented construction should be employed.

2. Diagrams of several commonly used grouting methods

3. During the secondary grouting, the following requirements should be met.

1.1 During secondary grouting, it should be performed from multiple points on one side or adjacent sides until it overflows from the opposite side, to facilitate air venting during the grouting process. Grouting from all four sides simultaneously is not permitted.

1.2 Once the grouting begins, it must be conducted continuously without interruption and the grouting time should be minimized as much as possible.

1.3 It is strictly prohibited to vibrate during the grouting process. If necessary, use a grouting booster to push the CGM grouting material along the bottom of the grouting layer, but严禁 pushing from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.

After the equipment foundation grouting is completed, a 45-degree bevel should be cut along the equipment edge within 3-6 hours after grouting (refer to the illustration below) to prevent cracks from forming at the ends. If edge cutting is not possible, the grouting layer surface should be smoothed with a trowel within 3-6 hours after grouting.

When the thickness of the grouting layer exceeds 150mm, use reinforced stone aggregate high-strength shrinkage-free grouting material.

1.6 When the base grouting volume of the equipment is large, mechanical mixing should be used for the gravel reinforcement grouting material to ensure the grouting construction.

Step 5: Maintenance

1. Immediately cover with a wet straw blanket or rock wool blanket within 30 minutes after grouting, and maintain its moisture.

2. During winter construction, the maintenance measures should also comply with the relevant provisions of the current (GB50204).

3. After the grouting material reaches the demolding time, the equipment installation can be carried out. Please refer to the "Demolding and Curing Time vs. Environmental Temperature Chart" for the specific time.

4. After the equipment foundation grouting is complete, if any part needs to be removed, gently scrape it off with a spatula or shovel tool within 3-6 hours after grouting, before the grout hardens.

5. Do not transmit vibration from operating machinery to the equipment foundation. After secondary grouting, the machine should be shut down for 24-36 hours to prevent damage to the unhardened grouting layer.

Packaging and Storage

Packaging specification: 50kg/bag, store in a well-ventilated and dry place, and prevent direct sunlight.

Guangxi: Liuzhou Nanning Qinzhou Visitors Guangxiang Port Chongzuo Yulin Guilin Wuzhou Baise Hezhou Beihai Hechi Fangcheng Port

Guangdong: Shenzhen Guangzhou Shaoguan Jiangmen Yunfu Yangjiang Zhuhai Qingyuan Maoming Shantou Foshan Zhongshan Huizhou Meizhou Dongguan Zhaoqing Zhanjiang Heyuan Shantou Chaozhou Jieyang

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $990.00 / ton
Sales None
Delivery GuangdongGuangzhou24hwithin
Stock 10000tonMOQ1ton
Brand Shi Jia Construction
Product Features High-tensile
Material Cement Grouting Material
Origin Guangdong
Expiry Long Valid
Update 2022-12-26 15:55
Gallery

Guangdong Shijia Gujian Building Materials Technology Co., Ltd.Published bySteel column base grouting material installationGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top