Guangdong Shijia Gujian Building Materials Technology Co., Ltd.VIP

高强无收缩灌浆料、高强聚合物砂浆、支座灌浆料、环氧树脂砂浆
Enter Shop

High-strength, early-strength, non-shrink grout for support installation

平台认证
  • Unit Price

    $1500.00/tons

  • Brand

    Shi Jia Construction

  • MOQ

    1tons

Contact
Leave Msg

Platform Service

Supplier Verified



广东士佳固建建材技术有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Shi Jia Construction

  • Unit Price:

    $1500.00 / tons

  • MOQ:

    MOQ1tons

  • Total:

    10000tons

  • Address:

    GuangdongGuangzhou

  • Delivery:

    3days

  • View More

Description

CGM High-Strength Non-Shrink Grouting Material

Product Features1. Early strength, 1-day compressive strength ≥ 27 MPa; 3-day compressive strength ≥ 40 MPa; 28-day compressive strength ≥ 60 MPa.

2. Microexpansive

Ensure tight contact between the equipment and foundation, with no shrinkage after secondary grouting.

3. High fluidity

Fills all voids, meets the requirements for secondary grouting of equipment.

4. Anti-segregation

Overcame the phenomenon of segregation caused by excessive water addition during on-site use.

5. Crack Resistance

Cracking phenomena during on-site use due to uncertain water addition, ambient temperature, and limitations of maintenance conditions.

6. Durable

After millions of fatigue testsNo significant change in strength after 50 freeze-thaw cycles. Strength significantly increased after soaking in engine oil for 30 days.

7. Suitable for winter construction

Permitted toOutdoor construction at -10℃ temperatures.

Product Application:

1. Used for secondary grouting of equipment foundations.

2. For anchoring foot bolts and reinforcing bar embedding.

3. Used for reinforcement and repair of concrete structures.

Technical Specifications:

Preparation before construction

1. Machine Mixing: Concrete mixer or mortar mixer;

2. Manual Stirring: Several mixing tanks and shovels

3. Several buckets;

4. Several scales

5. Chute

6. High-position funnels, grouting pipes, and pipe fittings;

7. Grouting Propeller

8. Templates (Steel molds, Wood molds)

9. Burlap bags, rock wool blankets, etc.

10. Cotton yarn, tape;

Grouting construction

Step 1: Basic Processing

The base surface should be roughened. Clean the base surface, ensuring there is no debris such as gravel, slurry, loose dust, oil stains, and release agents. Prior to grouting24 hours, the base surface should be fully moistened. Remove standing water 1 hour before grouting.

Step 2: Feel and Touch

1. Set up forms according to the grouting construction drawing. Seal the joints between forms and the foundation, as well as between forms, using cement grout and tape to ensure the overall form is waterproof.

2. The horizontal distance around the template and base should be maintained at approximately 100mm to facilitate grouting work.

3. The template's top elevation should be 50mm higher than the surface of the equipment base.

4. In case of leakage during grouting, it should be addressed promptly.

Step 3: Grout Mixture Preparation

Generally, mix with water according to a standard of 13-14% for general reinforced type, and 9-10% for pebble reinforced type.

2. Stir using a mechanical mixer for 1-2 minutes (do not use a drill mixer). When stirring manually, first mix for 2 minutes with 2/3 of the water, then add the remaining water and stir until uniform.

3. The mixing quantity should be determined based on the usage amount to ensure the material is used up within 40 minutes.

4. It is strictly prohibited to add any admixture or external additive to the CGM grouting material during on-site use.

Step 4: Grouting Construction Method

1. For longer equipment or track foundations, segmented construction should be employed.

2. Illustrations of Several Common Grouting Methods

3. During the secondary grouting, the following requirements should be met.

1.1 During secondary grouting, the grout should be applied from multiple points on one side or adjacent sides until it overflows from the opposite side, to facilitate air release during the grouting process. Grouting from all four sides simultaneously is not allowed.

1.2 Once grouting begins, it must be conducted continuously without interruption, and the grouting time should be minimized as much as possible.

1.3 It is strictly prohibited to vibrate during the grouting process. If necessary, the grouting booster may be used to push the CGM grouting material along the bottom of the grouting layer, but it is strictly forbidden to push from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.

After the equipment base grouting is completed, a 45-degree bevel should be cut outward along the equipment edge within 3-6 hours post-grouting (refer to the illustration below) to prevent cracks from forming at the ends. If edge cutting cannot be performed, the grouting layer's surface should be smoothed with a trowel within 3-6 hours after grouting.

When the thickness of the grouting layer exceeds 150mm, use reinforced high-strength, non-shrinkage grouting material with gravel aggregates.

1.6 When the base grouting volume of the equipment is large, mechanical mixing should be used for the aggregate reinforced grouting material to ensure the grouting construction.

Step 5: Maintenance

1. Within 30 minutes after grouting is complete, immediately cover with a wet straw lid or mineral wool blanket and maintain moisture.

2. During winter construction, maintenance measures should also comply with the relevant provisions of the current >GB50204.

3. After the grouting material reaches the demolding time, the equipment installation can be carried out. Please refer to the "Demolding and Curing Time and Environmental Temperature Relationship Table" for the specific time.

4. After the equipment foundation grouting is completed, if any parts need to be removed, they can be gently scraped off with a trowel or shovel tool 3-6 hours after grouting, before the grouting layer hardens.

5. Do not transmit vibration from operating machinery to the equipment foundation. After secondary grouting, the machine should be shut down for 24-36 hours to prevent damage to the unhardened grouting layer.

Packaging and Storage

Packaging specifications: 50kg/bag, store in a well-ventilated and dry place, and protect from direct sunlight.

Guangxi: Liuzhou Nanning Qinzhou Guests Guangxiang Port Chongzuo Yulin Guilin Wuzhou Baise Hezhou Beihai Hechi Fangcheng Port

Guangdong: Shenzhen Guangzhou Shaoguan Jiangmen Yunfu Yangjiang Zhuhai Qingyuan Maoming Shantou Foshan Zhongshan Huizhou Meizhou Dongguan Zhaoqing Zhanjiang Heyuan Shanwei Chaozhou Jieyang

Guangzhou Yuexiu District Tianhe District Baiyun District Liwan District Luogang District Huangpu District Haizhu District Panyu District Huadu District Nansha District Chenhu City Fromhua City

Shenzhen Luohu District Futian District Nanshan District Bao'an District Longgang District Guangming New District Pingshan New District Salt River District

Zhuhai Doumen District Jinwan District Xiangzhou District

Shantou Chaoan District Chaoyang District Chenghai District Haojiang District Jinping District Longhu District South Australia

Foshan Chancheng District Nanhai District Shunde District Three Shui District Gaoming District

Shaoguan Lechang Nanyung Qujiang District Renhua Milk Source Shixing Wengyuan Wujiang District Shin Feng Xianjiang District

Zhanjiang Chikan District Leizhou Lianjiang Mazhuang District Pootou District Suixi Wuchuan Xia Shan Xuwen

Zhaoqing Deqing Dinghu District Dongzhou District Fengkai Gaoyao Guangning Huaiji Sihui

Jiangmen Enping HeShan Jianghai District Kaiping Pongjiang District Taishan Xinhui District

Maoming Maoming Maoqiao District Huazhou Xinyi Gaoyao Dapu

Huizhou Huai District Huai'an District Huidong Boluo Dragon Gate

Meizhou Dapu Fengshun Jiāolǐng Mei River District Meixian County Pingyuan Wuhua Xingning

Shantou Urban area Haifeng Lufeng Luhu

Heyuan Dongyuan Peace Lianping Long Chuan Yuanqu District Purple Gold

Yangjiang Jiangcheng District Springtime Yangdong Yangxi

Guangyuan Fuhao Lian Nan Lianshan Lianzhou Qingcheng District Fresh Yangshan English-German

Dongguan Dongzhou District Fengkai Kaoyao Guangning Huaiji Sihui Doumen District

Zhongshan Chaozhou Chao'an Raoping Xiangqiao District

Jieyang Huihua Jiedong Jie Xi Puning Rongcheng District

Yunfu Luoding Emerging Yunan Yun'an Yunqu District

Haikou Longhua District Meilanzhuang District Qiongshan District Xiu Ying District

Sanya State-owned farm Haitang Bay Town Jiyaoyang Town Phoenix Town Hebei District Dongjiang District Yacheng Town Tianya Town Yucai Town

Sansha City Wuzhi Mountain City Qionghai Danzhou Wenchang Wanning Oriental Chengmai Ding'an Tunchang Lingao

White Sand Changjiang Le Dong Lingshui Baoxing Qiongzhong

 




Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $1500.00 / tons
Sales None
Delivery GuangdongGuangzhou3dayswithin
Stock 10000tonsMOQ1tons
Brand Shi Jia Construction
Product Features Early and high strength
Material Cement-based
Origin Guangdong
Expiry Long Valid
Update 2022-12-22 15:11
Gallery

Guangdong Shijia Gujian Building Materials Technology Co., Ltd.Published byHigh-strength, early-strength, non-shrink grout for support installationGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top