Shanghai Rongshi Technology Development Co., Ltd. was established on January 1, 2016, with its headquarters in Shanghai. Currently, Rongshi Technology is involved in internet marketing, software development, system integration, and also micro-commerce product development!
Electronics, mechanical and electrical, networking, biological, computer information technology field development, technology transfer, technical consultation, technical services, low-voltage engineering, network engineering, computer information system integration, software development, sales of computers, software, and equipment.
The mobile app development process is:
Firstly, creating an app requires a relevant idea, meaning the first step is to form the app's concept.
2. Utilize these ideas to design the main functions of the APP, as well as the general interface concept and design.
3. Coding of major function modules and rough interface module creation. Before writing the interface modules, developers can perform extensive function development within the simulator.
In fact, for iNotes development, the simulator is inadequate. The simulator's multi-touch support is very weak, and many touch tests cannot be conducted on the simulator. It is particularly worth noting that during the process of functional development, attention should be paid to memory usage, which is also an important mindset in iOS development.
4. After connecting the rough interface and functions, the app's basic demo is ready. It's worth mentioning that having a UI designer can save a significant amount of time. For instance, in terms of UI design, you can write functional modules in sync with the designer. Once the app demo is ready, you'll essentially have an interface that's ready to use. Based on feedback from test users, repeat the series of steps after the initial demo is released.
5. After the app is completed, add elements such as app icon, iTunesArtwork, and other UI components. Upload to iTunes after thorough testing with no errors. It will then take approximately 7-14 days to wait for approval.


































