The construction of hydraulic tunnels generally uses full circle lining trolleys, and concrete construction longitudinal joints are not allowed inside the tunnel. When the span of a hydraulic tunnel is large, a full circumference walking type is generally used. The side arch lining trolley is widely used in the construction of concrete secondary lining for highways, railway tunnels, and underground caverns.























































































