In the construction of artificial turf for various uses, the installation of the perimeter, specifically the wall-mounted structures, poses a challenge. Due to the considerable weight of each roll of artificial turf, it's difficult to secure it to a smooth wall with glue, thus placing significant demands on the construction crew in practice.
Step 1: Preparation - Before construction, remove any foreign objects from the walls and ensure the surface is dry, leaving no moisture. Maintain the wall's flatness to avoid unevenness. Prior to work, keep the ambient temperature above 5 degrees Celsius and lay out the lawn 20 hours before starting to prevent wrinkles.
Step Two: Secure the joists. The key to artificial grass installation lies in the secure fixing of the joists, making the joist fixation a critical part of the fence construction. First, manually secure the joists to the wall. Then, mark the spots where nails should be placed. Use the appropriate tools to firmly attach the joists to the wall at the marked spots.
Three Steps: Install Artificial Turf - When installing artificial turf, it is often necessary to cut the turf to the appropriate size, and the construction of the barrier is no exception. The turf should be cut according to the dimensions of the wall to avoid affecting the aesthetics. Use nails to secure the cut turf to the joists, then apply glue to the edges of the turf and proceed with the bonding. Note that the bonding must be done in one direct application without any deviation.
Four Steps: Turf Stabilization – The stabilization of artificial turf during installation is essentially a test of its strength. Generally, after the artificial turf installation is complete, it takes about three days for the stabilization to be finished. However, a second inspection is required on the tenth day. During the stabilization period, it is crucial to avoid any movement or external force on the artificial turf to achieve optimal results.
Simple Steps for Installing Construction Site Green Fencing!
Although the construction requirements for perimeter fencing are high for artificial turf, demanding a high level of technical expertise, once the artificial turf installation is complete, the aesthetic appeal of the perimeter fencing enhances the environment in a way that is hard to achieve naturally. Moreover, the lifespan of the perimeter fencing turf exceeds ten years, making its value quite significant.