Lighting collision guardrails_SupplyPro Co., Ltd._Liaocheng Zhenyao Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Liaocheng Zhenyao Materials Co., Ltd.

Specialized in manufacturing bridge guardrails, landscape guardrails, river e...

19963598616

Lighting collision guardrails

产品Price 150.00/Rice

最小起订Quantity:1 Rice 供货总Quantity: 100000 Rice

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shandong/Liaocheng
有效期至:
长期有效
最后更新:
2022-04-29 16:11
Product Details

Jinan Bridge Lighting Guardrails

Hangzhou Bridge Lighting Guardrails

200 meters

Jining Bridge Lighting Guardrails

100 meters

Anhui Bridge Lighting Guardrails

300 meters

Qingdao Bridge Lighting Guardrails

200m

Yantai Bridge Lighting Guardrail

300 meters

5 Points for Bridge Lighting Guardrail Installation! 1. Use a release agent to ensure the concrete color is even and the surface smooth. 2. Template processing follows the craft of mechanical manufacturing, with rounded corners at the intersection for smooth lines and dimensions strictly made according to design requirements. Test assemble and number the templates, and make timely corrections for misalignments and unevenness. Templates must have sufficient strength and rigidity to prevent deformation during construction. Installation of guardrail templates should be strictly according to specifications to ensure no slippage, misalignment, deformation, or leakage during concrete work, and to guarantee the appearance quality of the concrete. 3. Embed 40cm support steel at 10cm above the beam surface, ensuring the lower section size and tightening with tie rods. Use 17cm steel as support on the top surface, tightened with tie rods to secure the upper section size. Embed steel bars at a certain distance on the inside of the guardrail as support points for the top pulling template, firmly supporting the guardrail template for stability. 4. Apply plastic tape at the template joints, tighten templates with screws, and fill the joints between the template and the paving layer with sponge material to ensure tightness, no leakage, or contamination. Control misalignment during template installation. 5. Set the bridge lighting guardrail crack at the pier top and midspan. For spans greater than 30m, additional cracks can be added to prevent concrete cracking under traffic loads. Use foam material for the crack and steel plates for the end templates.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
19963598616

Back to Top