    Machine maintenance is a crucial daily task that should be closely coordinated with operation and maintenance, with dedicated staff on duty for inspections.

    Plastic Grinding PowderInstallation of the machine

    1All machine load bearings are lubricated, so proper lubrication is crucial for bearing longevity, directly affecting the machine's lifespan and availability. It requires that the lubricating oil be clean and the seals must be well-sealed.1Rotary Bearing2Rolling Bearings3All gear bearings, sliding surfaces4Event.

    2Ensure regular inspections for newly installed wheels that may be loose.

    3Pay attention to whether all parts of the machine are functioning normally.

    4Please check the wear degree of vulnerable parts and replace them as needed.

    5Ensure the base surface where mobile devices are placed is free of dust and debris to prevent serious accidents, as the moving bearing of the material may not be able to move on the base if the machine fails to crush.

    6Increase in bearing oil temperature requires immediate shutdown for inspection and cause elimination. Water-cooled bearing seats must be opened before startup.

    7Immediate inspection and elimination of the impact noise from the rotating gears in operation.

    Plastic Grinding Mill Maintenance

    Equipment should be installed on a level concrete foundation and secured with anchor bolts.

    1The new plastic rolling mill is equipped with vibration-damping pads for machine tools, thus eliminating the need for them.

    2Ensure proper horizontal and vertical alignment during installation.

    3After installation, check if all bolts are loose and if the main storage door is secure. If so, please tighten them.

    4Configure power cables and control switches according to the equipment's power supply settings, and pay attention to the motor's rotation direction.

    5After the inspection is completed, an empty-load test will be conducted. Production can proceed once the test is normal.


Contact us

Dao Valley (Jiangsu) New Material Technology Co., Ltd.

Service Hotline

13306172397

Company Telephone

13306172397

Address

No Chinese content provided.


Message Consultation

 Click submit means you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》