    Epoxy Floor Maintenance

    2024-05-22

    Epoxy floor coatings are high-value, high-quality, and high-demand products. Proper application ensures that the surface remains as good as new and extends its service life significantly.

     

    No Chinese content provided.

     

    1. After the flat ground construction is completed, it requires 7-10 days of maintenance before it can be put into use. During the maintenance period, it should be avoided to let water or other solutions seep into the surface.

     

    Employees entering the workshop must wear shoes with non-slip soles (not foam-bottomed black shoes) to prevent bringing in outside mud and sand that could scratch the floor.

     

    All hardware, such as iron chairs, iron tables, and iron shelves, must have their legs wrapped with soft plastic, rubber, or padded with cardboard to prevent scratches during use.

     

    Scratched ground

     

    4. Ensure that the machine plate is fully elevated from the ground when lifting the drawbar. Pay special attention to avoid scraping the ground with the plate corners during turns.

     

    5. When cleaning the floor, please use a soft, absorbent mop or a wet-dry vacuum. They can be cleaned with plain water or detergent, but be cautious of the slippery surface.

     

    6. If wear or scratching occurs due to prolonged use, minor areas can be patched up locally. For larger areas, it's recommended to repaint the surface once again.

     

    7. Prior to the equipment's arrival, lay cardboard boxes on the ground level to protect the surface from scratches during transportation.

     

    Please use hard or elastic rubber wheels for the carts and handtrucks, and separate their use indoors and outdoors in the factory.

     

    9. Can be waxed to meet ground requirements (which can prevent ground scratches).

     

     

    Construction Techniques

     

    1. Surface Treatment: Sand off loose layers, delaminations, and cement residues to achieve a hard, smooth surface, and enhance the adhesion between the floor coating and the ground.

     

    2. Prime Coat Application: Once the epoxy sealant primer is mixed, apply it by rolling, scraping, or brushing to ensure thorough wetting of the concrete and penetration into its inner layers.

     

    3. Middle Coat Application: Thoroughly mix the middle coat material with an appropriate amount of quartz sand, then apply it evenly using a trowel to create a smooth and dense layer of a specified thickness.

     

    4. Surface Patching: Utilize surface coating material mixed with quartz fine powder for patching, filling in the gaps between larger particles of the intermediate coating. After complete curing, sand the surface with a dust-free grinder.Surface with a vacuum cleaner to remove all dust, then sand down to a smooth finish.

     

    5. Surface Coating Application: After mixing the epoxy color paint and hardener evenly, apply it by troweling, brushing, rolling, or spraying to achieve a smooth and even finish.Layer



Contact us

Shanghai Yuanliang Decoration Engineering Co., Ltd.

Service Hotline

13636372588

Company Telephone

13636372588

Address

No. 312, 3rd Building, 643#, Guangming Agricultural Village, Qingcun Town, Fengxian District, Shanghai


Message Consultation

 Click submit means you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》