Dongguan Kangzimei Building Materials Technology Co., Ltd.VIP

无机整体磨石 彩色自流平水泥 无机复古地坪 彩色饰面砂浆 微水泥
Enter Shop

Crystal Art Whetstone

平台认证
  • Unit Price

    Negotiable

  • Brand

    Other

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市康之美建材科技有限公司

VIP   数字营销第2年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Other

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0Electricity negotiation

  • Address:

    GuangdongDongguan

  • Delivery:

    0Hours

  • View More

Description


Application Scope

New or renovation of existing floors for residential, villa, shopping mall, office building, club, hotel, school, entertainment and leisure venues.

 

Performance Advantages

High construction thickness redundancy, ranging from 5 to 25mm, with excellent leveling properties, allowing for faster laying and construction speed.

Fast-setting and early strength, ready for grinding in 24 hours, shortening construction cycle, preferred material for quick installation and repair.

Inorganic material, free from radioactivity and VOC emissions, Class A fire resistance, high safety.

Excellent crack resistance of materials, seamless installation over large areas, achieving an integrated floor design.

Moisture-resistant surface with Mohs hardness 5~7, excellent wear resistance; non-slip and non-damp.

The base color and aggregate particle colors are rich and customizable to meet customer specifications.


 

ConstructionProcess

1. Prepare Substrate: The substrate must be solid and free of contaminants before construction, with all laitence, holes, and cracks to be repaired; the substrate should not have any potential movement or cracking. The minimum required strength for the base layer is greater than 20MPa. Specific cleaning methods: Use a high-speed debris cleaner to scrub the concrete floor back and forth to remove laitence; for tile, stone, terrazzo, and abrasive ground, abrade the surface to create at least 80% of a rough texture.

2. Apply Primer: The base surface should have less than 7% moisture content when applying the primer. After cleaning, allow the ground to dry completely before mixing the company's three-component primer evenly and rolling it onto the base surface. Meanwhile, evenly sprinkle 40-60 mesh fine sand over the primer to form a full coverage. Sweep up any loose sand particles that have not adhered after 6 hours.

3. Install spacers after leveling or leave empty spaces according to the design pattern.

4. Material Mixing and Spreading: Follow the water ratio indicated on the packaging. Precisely weigh the water for each package, mix thoroughly with an electric high-power mixer, and spread evenly from the inside to the outside of the work surface. Use a long scraper to assist in smoothing, paying special attention to the edges and the junctions between each batch of materials to ensure uniform aggregate particles. When smoothing, push the aggregates along with the material, not just scraping the surface paste. The construction should be continuous, and the mixed slurry should be used up within 30 minutes.

5. Optimal construction thickness is 10-15mm, immediately roll a professional exhaust roller over the slurry surface to eliminate bubbles.


Cautionary Notes

This product is a thin-layer construction material and cannot withstand basic deformation or cracking of the sub-layer. If there is a risk of cracking or potential cracking on the base surface, please choose with caution.

When spreading materials, pay attention to the evenness of aggregates to avoid uneven stone exposure.

Note the flatness of the base surface and construction thickness to avoid penetration during sanding.

When first grinding, start with a high grit abrasive disc and choose the 1# disc based on the actual strength of the floor.

The seamless construction area is up to 10 meters by 10 meters.


Standard: JC/T985-2017


Packaging and Storage

25kg per bag, should be stored in a dry, well-ventilated environment, free from moisture, with a shelf life of 6 months.


 



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan
Brand Other
Application Range Home,别墅,Villa,Shopping malls,Office buildings,Clubs,Hotels,Entertainment
Origin Guangdong, Dongguan
Contact Information 134-123-972-60
Expiry Long Valid
Update 2025-05-08 14:40
Gallery

Dongguan Kangzimei Building Materials Technology Co., Ltd.Published byCrystal Art WhetstoneGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top