Establish a technical management system with a technical responsible person at the core at the beginning of the demolition project. According to the project characteristics and construction specifications, formulate a safe, reasonable, and economic technical plan to guide the construction. Go deep into the site, identify and resolve issues in a timely manner at the construction site. Focus on writing construction technical measures for special sections, difficulties, key points, and focal areas during construction. All construction organization designs must be reviewed by the company's chief engineer and project chief engineer, then submitted for approval to the construction unit and supervision unit. Supplement and improve the construction organization design based on the approval opinions.
Demolition of contracted chemical factories, disposal of chemical equipment, specialized in recycling and dismantling of defunct chemical factories and equipment. Possesses first-class demolition qualifications, chemical dismantling qualifications, and other complete qualifications. Long-term provider of engineering demolition, factory dismantling, large hotel interior and exterior demolition and recycling, factory demolition, company relocation projects, and various types of factory, office building, hotel, and shopping mall interior demolitions. Chimney, water tower, and tall structure demolition and recycling, portable buildings, temporary structures, power distribution rooms, electrical cables, etc. Large-scale chemical equipment, steel structure frames, pressure equipment, oil storage facilities, large storage tanks, pipeline equipment, refrigeration equipment, air conditioning systems, production assembly lines, etc.
As the modernization process advances, environmental issues are becoming increasingly prominent. The company has always prioritized environmental protection efforts, continuously exploring and seeking the best demolition solutions. We have introduced the most advanced dust control equipment in the industry, collaborated with the Environmental Protection Bureau to adopt green dust coverants and other advanced technologies, and purchased noise-reducing materials for soundproof screens and barriers. We have also gradually established systems, strengthened management, and improved the system. In 2013, we successfully passed the ISO 14001:1996 international environmental management system certification.
Regarding the cost-effectiveness of dismantling the company, if we solely consider the price, it's undoubtedly less favorable than that of emerging enterprises. However, when factoring in service and quality along with other aspects, consumers and clients will not regret choosing this company. After all, it has accumulated a certain reputation and evaluation, and is still worthy of consumers' recognition and preference.