A subway production equipment workshop has encountered a serious problem of ground subsidence, primarily caused by the long-term operation of locomotives that far exceed the bearing capacity of the original foundation design. The vibrations generated during the entry and exit of the locomotives further exacerbated uneven ground settlement, with the subsidence reaching 8 centimeters. This has led to extensive cracking of the ground surface, posing a severe threat to the production safety of the locomotives.
Faced with this severe challenge, the manufacturer swiftly took action, inviting our company for an on-site inspection and resolution. As a leading player in the ground reinforcement field, we boast extensive experience and advanced technical methods, promptly responding and dispatching professional technicians to the site.





























