Yantai Kexin Watch Co., Ltd.VIP

塔钟-塔钟维修,学校校园大钟维修,室外大钟表维修,建筑钟表钟楼大钟
Enter Shop

Manufacturer supplies architectural grand clocks, engineering tower clocks, Kexin intelligent fault self-recovery GPS automatic time synchronization

平台认证
  • Unit Price

    $30800.00/Set

  • Brand

    Kexin

  • MOQ

    1Set

Contact
Leave Msg

Platform Service

Supplier Verified



烟台科信钟表有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Kexin

  • Unit Price:

    $30800.00 / Set

  • MOQ:

    MOQ1Set

  • Total:

    15Set

  • Address:

    ShandongYantai

  • Delivery:

    3days

  • View More

Description

     

Yantai Kexin Watch Co., Ltd. produces tower clocks with precise timing and no errors, mainly relying on the following technological guarantees:

1. GPS real-time time synchronization, ensuring accuracy with the time, with the master control system's master clock having no cumulative error, every second and minute is spot-on.

2. Reliable IoT technology and feedback supervision system for sub-clocks (face clocks), ensuring synchronization between the face clocks and the master clock. The sub-clocks automatically synchronize with the master clock every 15 seconds. In case of a sub-clock failure, an automatic alert is issued along with a suggested solution.

3. Our self-produced movement is the core component of the tower clock, crafted from tin bronze for the bearing bushes and 45-grade steel that has undergone rigorous mechanical heat treatment, significantly enhancing its wear resistance. The fully enclosed design ensures no maintenance or保养 is required, guaranteeing a lifespan of 50 years.

4. Professional installation staff is the guarantee for the normal operation of the equipment. Our company boasts skilled installers and several well-trained高空作业 personnel. Our experience is that three parts rely on the equipment, and seven parts on the installation. Local offices and service outlets truly ensure that customers can purchase with confidence and use without worry.

5. With years of technical accumulation, our company is capable of repairing tower clocks from all brands across the nation. To assure our customers of their choice, we promise a 3-year free warranty on all repairs.

Tower Clock Grand Clock Production and Installation Process:

Estimated Completion Time: 30 calendar days

Including: Manufacturing Lead Time: 20 days

Transportation and installation timeline: 10 days

1. Production, guaranteed manufacturing schedule

1. As per the signed contract. The day after the contract is signed, the company will issue production schedules to all production departments (each production workshop, technical department, logistics center). The schedule should clearly specify the dimensions, colors, functions, and shipment times of each product. Additionally, an itemized "Material Requirement Sheet" should be attached.

2. The technical department is responsible for determining the technical solution based on the specific requirements of the client's tender documents, and providing it to the production workshop for production. The logistics center, based on the "Material Requirement Sheet" and the current inventory status, drafts a detailed "Procurement Plan Sheet." The procurement plan is then issued to: electronic component procurement staff, outsourced procurement staff, and bulk material procurement staff. The required approximate funds are also notified to the finance department.

3. Begin procuring various materials starting from the second day, with priority given to the urgent materials needed for production.

4. The company's existing inventory of spare parts and equipment, such as control systems and cores, will be immediately put into production as per contract requirements. The basic manufacturing of control systems and cores will be completed within the 3rd to 13th day. Subsequently, they will progressively enter the debugging and trial operation processes.

5. Basic completion of the clock face production (no adjustment required for the appearance components) within the 3rd to 13th day.

6. By the 8th to 11th day, all packaging materials will be in stock, and the wooden boxes for packaging will be completed.

7. All debugging completed within the 18th day, *perform inspections prior to packaging, and fill out various documents and forms for packaging purposes.

8. All packaging completed by the 19th day.

9. Notify Party A that the shipment is ready for dispatch, and confirm with Party A the specific unloading location and installation time.

10. The installer will arrive at the installation site in advance, according to the agreed schedule, to prepare for the installation. The following day, they will inspect the goods with Party A and begin the installation process.

II. Clock Equipment Transportation and Installation Plan:

Packaging, Shipment, and Transportation Solutions

1. In terms of packaging, for general control instruments and computer accessories, we use cardboard boxes, lined with shock-absorbent foam and moisture-proof plastic bags inside. For items like dials, valuable materials (such as control boxes, clock hands, and scales), and goods weighing over 20 kg, we add an outer wooden crate made of high-quality plywood. Similarly, shock-absorbent foam is also installed between the wooden and cardboard boxes. All packaging is neat, attractive, and reliable, loaded onto trucks according to road transportation requirements to ensure goods arrive intact and undamaged.

Each packaging box is accompanied by a detailed product packing list, factory certification of conformity, quality inspection certificate, instruction manual, etc. The boxes are sealed after being inspected and approved by the inspector.

3. Each packaging box is imprinted with the shipper, departure station, consignee, destination station, product name, gross/net weight, total number of pieces in this shipment, contract number, etc. Additionally, it features the "Three-Proof" symbol.

4. Transportation: For this shipment of *** equipment, we will select the most suitable transportation method, such as trucking or rail transport, based on the installation location of the tower clock project and the requirements for equipment transportation security. We guarantee the safe, accurate, and timely delivery of the goods to the destination. Any losses due to loss or damage will be borne by us. Within 48 hours prior to the shipment of the equipment, we will send the recipient a fax with details including the station name for installation, quantity, estimated installation date, contract number, material name, quantity, gross weight, volume, amount, and the name of the transportation vehicle, as well as the equipment shipment schedule.

5. Arrival Inspection and Handover

Upon arrival at the destination, our project manager and the client's representative will jointly inspect the goods as per the contract. The inspection scope includes the quantity, specifications, model, quality, performance parameters, and more. Both parties will sign and seal the delivery (receipt) document, which serves as a crucial basis for operational handover. If any goods do not meet the client's requirements, the client has the right to refuse acceptance or request a replacement, and any resulting costs will be borne by our company.

(II) On-site Inspection and Installation Entry

1. On-site Installation Inspection

1) Upon arrival of the goods at the site, the installation personnel will, together with the recipient, check the quantity of packaging boxes and their condition for any damage or missing items, as per the "Shipment Registration Form."

2) Inspect the goods inside the packaging boxes with the buyer, checking each item against the packing list.

3) Briefly describe the name, quantity, use, and storage requirements of various goods for the buyer, so that a safe storage location can be provided.

2. Installation On-Site

1) All goods will arrive at the designated location according to the installation schedule as per the contract or mutually agreed upon by both parties. Prior to installation, a storage location for the goods will be agreed upon with Party A to ensure a safe storage area for the non-installed items.

2) Collaborate with the buyer to establish installation conditions and make necessary modifications to those that do not meet requirements for a safe and smooth installation.

3) Inform the buyer of the approximate time for inspection to allow for preparation.

(3) Clock Equipment Installation

Equipment Installation Steps:

Assemble the clock face on the designated work surface.

2. Rent suitable hoisting equipment and use the whole hoisting method to weld or bolt the steel frame of the large bell with the reserved iron components of the bell tower.

3. Reserve pipelines between the subclock and the master clock, lighting lines, and pipelines between the horn and amplifier.

4. Connect scale lighting wire, movement lighting wire.

5. Install the speakers and connect the speaker power lines.

6. Connect the motor wire and feedback wire to the motor and feedback switch on the core.

7. Connect all motor lines, feedback lines, lighting lines, and speaker lines to the master clock system and the control room where the amplifiers are located.

8. Connect to the GPS time synchronization system.

9. Connect and debug the monitoring microcomputer.

Section 3: Clock Equipment Operation and Debugging

Debugging period: 3 calendar days, with simultaneous training for the client's designated operators during the debugging phase.










Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $30800.00 / Set
Sales None
Delivery ShandongYantai3dayswithin
Stock 15SetMOQ1Set
Brand Kexin
Product Features Intelligentized
Is Importing No
Origin Yantai
Expiry Long Valid
Update 2025-03-19 10:04
Gallery

Yantai Kexin Watch Co., Ltd.Published byManufacturer supplies architectural grand clocks, engineering tower clocks, Kexin intelligent fault self-recovery GPS automatic time synchronizationGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top