Fountain is a type ofBased on the musical melody and rhythmAnd what is created canDynamic TransformationFountain, aesthetically designed and often produces...3D effect. During this process, water flow control, scattering and refraction of light occur, and a 3D image is then produced.

Fountain Manufacturing Process:
The domestic and international music fountain production process usually involves selecting the music to be played; then, computer personnel utilize the music playbackThe 3D animation software creates water fountain patterns and lighting changes to reflect the music's emotions, and it is repeatedly fine-tuned until the representation is satisfactory. Next, the control personnel develop a control program based on the 3D musical fountain animation display, making the nozzles, variable frequency machines, and lights come to life, producing an actual musical fountain. This is also fine-tuned repeatedly to match the 3D animation display. Finally, the three systems (music playback, animation display, and control execution) are integrated for joint testing until they are perfectly matched. It can be seen that the entire production process lacks information integration, and is manually coordinated across the three production processes.

Fountain design requirements:
1. Prior to pipeline installation, clean the pipeline interior, ensure the main pipeline is level, the vertical pipeline is perpendicular and the main pipeline is securely fastened. Before applying anti-rust paint to the pipeline, remove corrosion and weld slag first. The pump installation should be firm and stable.
2. Lighting Installation: Lamps, manufacturing and installing light brackets, securing lamps.
3. Cable Laying and Connection: The cables for the pump and lights are routed according to specifications, with the principle of minimizing underwater joints. Cable lines are connected using heat-shrink tubing. Cables are bundled and pulled through cable conduits, sealed near the bell mouth. The pump and light cables are numbered as per the diagram. The cables can be laid through the cable trench to the control room and then into the distribution panel via cable trays.
4. Distribution Control Equipment Installation: Install control and distribution equipment in the control room according to the drawings, and connect the load equipment to the corresponding terminals of the distribution equipment by cable numbering.