Based on the performance characteristics of natural stone powder coatings, the application of natural stone powder coatings is generally divided into the following three types of application techniques:
Example of concrete wall application with natural stone powder paint
Layered approach example
1. Wall painting treatment
2. Wall Repair Material with Special Base Coat
4. Leveling with natural stone powder paint (scraping or spreading)
3. Leveling Base Material for Scrape (Spread) Application
5. Scrape (Wipe) Natural Stone Powder Coating Surface

General thermal insulation wall coating with natural stone powder method
Layered approach examples
1. Wall boundary painting treatment
2. Apply 2d thick thermal insulation mortar
3. Wall Repair with Special Base Material
4. Leveling Base Material for Scrape (Smeared) Application
5. Leveling with natural stone powder coating by scraping or spreading
6. Sanded (Wiped) Natural Stone Powder Coating Surface
General Masonry Wall Natural Stone Powder Paint Method
Apply a layer of glass fiber mesh at the wall junction.
2. Wall Repair with Special Base Material
3. Leveling Base Material for Scrape (Spatula) Application
4. Leveling with natural stone powder paint (sanding)
5. Scrape (Wipe) Natural Stone Powder Coating Surface
Construction Caution Notes
1. Prior to wall painting, remove surface dust, grease, sealant, and debris from wall corners to ensure smooth construction.
The surface is clean, and rust-proof paint is applied to metal items. Other walls should only remove protrusions exceeding the wall surface.5mm foreign matter
Just ensure cleanliness; no special treatment required.
2. Professional Base Material Wall Repair: Use dedicated base material for mending and straightening the internal and external corners, with the internal angle being corrected using a square rule and a level.
The method of stringing: use an aluminum alloy level with a square rule for the acute angle.
3. Level the base material by scraping, using a dedicated base and liquid material mixed in a 3:1 ratio to form a uniform paste. Scrape...
The product requires a level and straight application, with layers being painted evenly.(Note: If the base error is significant, it can be leveled in multiple passes; each pass should not exceed)
10mm)。
4. Leveling coating surface with stone powder, mixed evenly using natural stone powder fabric in a ratio of 2:1 by powder to liquid. Basic leveling achieved.
Flat, with minimal scuffs, standard scraping(Note: Intervals between each application should not be less than 2 hours, based on full drying.)
5. The stone powder coating surface should be polished with the same material ratio, requiring sandpaper to be used for smoothing before applying a single coat.
Construction is almost completed to minimize dust and other pollutants. Two people are required for the job: one for scraping and smoothing, and the other for cleanup.
Calendered. After drying, the surface is smooth, glossy, and has a good texture. Clean the edge areas and ensure product protection.
Description: Detailed construction processes are subject to the signed contract.
Note: The natural stone powder surface is divided into two types of powders (using troweling technique) and liquid (using spraying or rolling technique).
),Both products are made from the same raw aggregates, but are developed for different applications. The liquid product has a powder-like consistency.
Products of the same physical properties.