Waterborne polyurethane paintTMJ2K-M4
Application Scope:This productWidespreadShouldForA variety of machinery and equipment.Protection for metal surfaces such as stainless steel, aluminum alloy, galvanized plate, ironware, etc.PaintDecorative,And protective coatings for the repair of existing structures and the application of anti-corrosion systems on new structures, such as oil, gas, and water pipelines, as well as gas cylinders.
Composition and Performance:ThePaintIt is a two-component mixed paint, divided into paintACuring agentBAll are ground from modified resins, cross-linking agents, pigments, etc., and can be either air-dried or baked dry.。
1. The coating boasts excellent adhesion, providing superior bonding strength to steel, galvanized steel, and light metals.
2. Excellent resistance to alternating dry and wet conditions, oil resistance, superior three-proof performance, and resistance to damp heat.
3. The coating dries quickly, is resistant to water, acids, alkalis, and salts, boasts good physical and mechanical properties, and can be baked at low temperatures.
4. High fullness, aging resistance, and film-forming properties.
Technical Specifications:
1、Solids content∶≥50±1%;
2、Luster∶High-gloss, Matte;
3、Hardness∶2HAbove;
4Touch Dry:15-20Minutes, fully cured:24~48Hour(s)
5. Flexibility: ≤3mmAdhesion: ≤0Grade; reparative; ≤1Grade
Construction Methods and Precautions
1、Construction Mix (Weight Ratio): PaintA: Binder to Pure Water = 100:25; 25~75
2、AAfter the component drum is opened, it must be thoroughly mixed, and then, while stirring, it should be mixed according to the required proportions.BGroupPiecePourAIn the composition, fullyMix thoroughly, allow to stand, age30 minutesLater, add as required.Pure WaterAdjust to construction viscosity.
3、Construction Method∶Spraying, brushing,Roll Coating;
4、Substrate temperature must be above the dew point3Above 5℃, the coating will not cure if the substrate temperature is below 5℃, hence it is not suitable for application.。
5、Drying Conditions∶Room temperature self-drying or air-drying60~100°C)X(30Minute(s)
6Note: Ensure that the anti-rust primer and intermediate coating are fully cured before applying the topcoat, and that the surface is clean, dry, and free of contamination. Applying the topcoat to surfaces that have not fully cured may sometimes cause color bleeding, pinholes, and other unknown defects.
Packaging and Storage:
1、Standard Packaging∶ 4kg/Bucket 20kg/Bucket Curing Agent:1kg/Barrel2kg/Bucket
2、Store5-30Store in a dry, well-ventilated area. Excessive heat or exposure will significantly reduce shelf life.
Colors: Transparent, Red, Orange, Yellow, Green, Blue, Black, White, Gold, Silver, etc., customizable colors available.
Guangzhou Tianmai New Material Technology Co., Ltd.
Waterborne Polyurethane Paint TMJ2K-M4
Application Range:This product is widely used for the protection and coating of metal surfaces on various machinery and equipment, including stainless steel, aluminum alloy, galvanized plate, iron, and other metals, as well as for the structural repair and protective coating of new construction for oil, gas, and water pipelines, gas cylinders, and other structures.
Composition and Performance:This paint is a two-component mixed coating, consisting of Paint A and hardener B. Both are made from modified resins, cross-linking agents, pigments, etc., through grinding. They can be either air-dried or baked dry.
The coating exhibits excellent adhesion, offering superior bonding strength to steel, galvanized steel, and light metals.
Excellent resistance to alternating dry and wet conditions, oil resistance, superior three-proof properties, and resistance to humidity and heat.
3. Fast-drying film, resistant to water, acids, alkalis, and salts, with excellent physical and mechanical properties; the film can be baked at low temperatures.
4. High fullness, aging resistance, and film-forming properties.
Technical Specifications:
1. Solid Content: ≥50±1%
2. Sheen: High gloss, matte
3. Hardness: above 2H
4. Dry to the touch: 15-20 minutes, fully cured: 24-48 hours.
5. Flexibility: ≤3mm; Adhesion: ≤0; Repairability: ≤1
Construction Methods and Precautions
1. Construction Ratio (Weight Ratio): Paint A : Curing Agent B : Pure Water = 100:25; 25~75
2. After opening the container of Component A, it must be thoroughly mixed. Then, pour Component B into Component A while stirring according to the mixing ratio, ensuring thorough and even blending. Allow to stand and mature for 30 minutes, then add an appropriate amount of pure water and adjust to the desired working viscosity.
3. Application Methods: Spray, brush, roller coating;
4. The base material temperature must be above the dew point by more than 3°C. When the base material temperature is below 5°C, the paint film will not cure, so it is not suitable for application.
5. Drying Conditions: Air dry at room temperature or dry at 60~100°C for 30 minutes
6. Caution: Ensure that the rust-inhibiting primer and intermediate coatings are fully cured before applying the topcoat, and that the surface is clean, dry, and free of contaminants. Applying coatings on surfaces that have not fully cured may sometimes cause color bleeding, pinholes, and other unknown defects.
Packaging and Storage:
1. Standard Packaging: 4kg/bottle, 20kg/bottle; Curing Agent: 1kg/bottle, 2kg/bottle
2. Store in a dry, well-ventilated room between 5-30°C; shelf life will significantly decrease under high temperatures or exposure.
Colors: Transparent, Red, Orange, Yellow, Green, Blue, Black, White, Gold, Silver, etc., Custom color available
Guangzhou Tianmai New Material Technology Co., Ltd.































