


Spray painting production line engineering layout:
1. Spray Painting Line: Up conveyor chain - Spray painting - Drying (10min, 180°C-220°C) - Cooling - Down part 2. Painting Line: Up conveyor chain - Electrostatic dust removal - Primer - Leveling - Topcoat - Leveling - Drying (30min, 80°C) - Cooling - Down part The spray painting conveyor line solves the problems of existing construction personnel controlling the spray gun, which includes high labor intensity, low efficiency, large number of personnel, unstable coating quality, poor uniformity, and waste of paint. This automated spray painting conveyor line includes a mobile vehicle that can travel on the ground and an automated transverse spray device suspended at the rear of the vehicle. The control system for the vehicle is equipped with controls for longitudinal uniform movement and for controlling the lateral spray of the automated transverse spray device. This automated spray painting line can automatically perform large-area spraying according to set parameters, reducing the number of personnel, and has high spraying efficiency; the coating quality is stable and has good uniformity.































