Foshan Dabaxiang Building Materials Technology Co., Ltd.VIP

美缝胶 大鼻象美缝胶 大转湾美缝胶 免钉胶
Enter Shop

Guangdong No-Screw Adhesive Wholesale - Market Price - Manufacturer

平台认证
  • Unit Price

    Negotiable

  • Brand

    Other

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



佛山市大鼻象建材科技有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category
Recommend

Product Details

Specs

Gallery

  • Brand:

    Other

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0Negotiable by electric means

  • Address:

    GuangdongFoshan

  • Delivery:

    3days

  • View More

Description

Product Specifications
Origin:Guangdong Brand:Other Initial Dry Time:- Drying Time:- Adjustment Time:- Drying Time:- Water resistance:- Shear strength:- Appearance:Other Curing Conditions:Other
Product Features

Guangdong No-Screw Adhesive Wholesale - Market Price - Manufacturer Da Zhu Wan No-Screw Adhesive boasts strong adhesion, capable of largely replacing nails. It doesn't require pre-drilling to fasten and bond materials such as wood, gypsum board, MDF, stone, cement tiles, metal, plastic, rubber, and more. Product Features: 1. High bonding strength and tensile strength. 2. Good flexibility, non-crisp, maintains adhesion during building contraction and movement. 3. Versatile, bonds most substrates, even wet wood. 4. Non-sagging, can fill gaps, can be painted after drying. 5. Weather-resistant with waterproofing properties. Application Method: - Clean the construction surface, ensuring no oil or dust. - Cut the tube opening, attach the nozzle, and use a sealant gun for dry bonding: (suitable for lighter objects and low-pressure joints) squeeze several lines of adhesive in a zigzag pattern, with each line 40 cm apart; press the adhesive side towards the bonding area, then gently pull it apart for a few minutes to allow the adhesive to dry, and finally press the two sides together. - Bonding method: (suitable for heavier materials) apply the adhesive as per the above method, then use clamps, nails, or screws to secure the bonding surfaces. Remove the clamps after the adhesive has dried (about 24 hours), allowing the adhesive to move and adjust the bonding position for 20 minutes. The bond becomes more stable within 2-3 days and achieves optimal results within 7 days. Precautions: - Clean the adhesive with kerosene before it solidifies, then scrape or sand off any exposed residue. - Use in a well-ventilated area, away from high temperatures or fire sources, stored in a cool, dry place: avoid contaminating water sources; discard the remaining product only after it has dried completely. 1. High-intensity bonding 2. Stronger, more durable 3. Suitable for all weather conditions 4. Bonds a wide variety of substrates

Product Real Photos

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongFoshan3dayswithin
Brand Other
Shear Strength -
Origin Guangdong
Appearance Other
Expiry Long Valid
Update 2024-10-23 09:31
Gallery

Foshan Dabaxiang Building Materials Technology Co., Ltd.Published byGuangdong No-Screw Adhesive Wholesale - Market Price - ManufacturerGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top