Guangdong Foshan Dazhuanwan high-quality gap filling adhesive wholesale - manufacturer - supplier. Gap filling adhesive application process mainly includes the following steps: 1. First, prepare for the construction, clean the tile gaps, and use a small spatula to create a depression no more than 2mm deep in the tile gaps. This not only facilitates the application of the gap filling adhesive but also prevents excessive wear in the future by storing the adhesive in this depression. 2. Then, use a small brush to sweep away the debris scraped out. 3. Once the preparation is complete, you can start applying the gap filling adhesive. First, use a small needle to puncture the opening of the adhesive, then attach it to the glue gun and apply it along the tile joints as the method of loading the glue gun is simple. 4. After applying a line of tile joint adhesive, use a scraper to level the adhesive in the tile gaps immediately. 5. The new type of gap filling adhesive is quick-drying, so you need to clean it with a wet sponge within 10-15 cm after application, otherwise, it will be difficult to clean. 6. After two hours of construction, the surface is fully cured, and the construction area can be used normally after 24 hours.



































