Guangdong Daxiang Brand Grout Adhesive Supply - Quotation - Market Price - Construction Process 1. First horizontal, then vertical: Clean the tile gaps (place the razor flat; blade parallel to the tile edge; blade almost parallel to the ground) to create a 0.8mm groove; the sides of the groove should expose the tile edge. PS: Make sure the cross intersections are cleaned well. 2. Clean the dust inside the tile gaps: Use a vacuum cleaner or broom to sweep it clean; ensure the tile gaps are dry and free of dust and particles. 3. Take out the corresponding color of the grout adhesive: Peel off the label from the bottom, attach it to the bottle, pull the ring. Let the grout adhesive stand on the ground, hold a nozzle in your left hand with the sharp end facing down at the outlet, cover it with a wet towel, and tap the nozzle with your right hand to push the grout adhesive out. (Covering with a towel is to prevent the grout from spraying out ---- there's pressure inside the can); or you can also puncture the outlet directly with a pointed object. But be careful not to spray the grout on the wall, ceiling, or body; screw the nozzle onto the grout outlet; insert the glue gun; prepare to apply the grout. Wet the sides of the tile gaps with a damp towel; but the inside of the tile gaps must be clean and dry (this detail must be paid attention to!!!) 4. Apply a line of grout: For beginners, start with 20cm-50cm, and gradually increase the length as you become more skilled, then place the glue gun flat; place a collection board under the nozzle; 5. Level the grout: (mainly use a water scraper; a sponge; fingers can also be used) PS: How to hold the water scraper; place the four fingers on top, the thumb under the water scraper, transfer the excess grout scraped by the water scraper to the sponge. Continue steps 3, 4, and 5 until all horizontal lines of the grout are level; the grout surface will solidify for about 20 minutes; after feeling the grout has solidified, you can do all the vertical lines; 6. Within half an hour: Wipe the remaining grout on the sides of the tiles with a wet towel; 7. After 24 hours; normal use. The above method is to wipe clean after the grout has solidified for half an hour; there is another method online that is to clean the grout directly after it is leveled, mainly including the following steps: 1. First, prepare for the construction, deal with the tile gap, use a small shovel to scrape out a groove less than 2mm deep in the tile gap, which not only facilitates the application of the grout but also the grout stored in this groove can also avoid excessive wear in the future. 2. Then, use a small brush to sweep away the dirt scraped out. 3. After the preparation is done, you can start the grout adhesive, use a small needle to pierce the opening of the grout adhesive, then install it on the glue gun, since the method of installing the glue gun is relatively simple, apply along the tile gap. 4. After applying a line of the tile gap, use a scraper to level the grout adhesive in the tile gap immediately. 5. The new grout adhesive is quick-drying, so you need to clean it up with a wet sponge after applying 10-15 cm, otherwise, it will be difficult to clean. 6. After two hours of construction, the surface is completely solidified, and the construction surface can be used normally after 24 hours.



































