Guangzhou Senmei Recycled Resources Co., Ltd.VIP

主要经营:过期产品、缺陷产品、不合格产品、假冒伪劣产品、工业品以及机密材料处理服务
Enter Shop

Maoming dry transformer recycling, contributing to the construction of the new energy system.

平台认证
  • Unit Price

    $2000.00/A

  • Brand

    Sun Beauty

  • MOQ

    1A

Contact
Leave Msg

Platform Service

Supplier Verified



广州森美再生资源有限公司

VIP   采商通第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Sun Beauty

  • Unit Price:

    $2000.00 / A

  • MOQ:

    MOQ1A

  • Total:

    666A

  • Address:

    GuangdongGuangzhou

  • Delivery:

    0Hours

  • View More

Description

Transformer Recovery: Installation Steps for Transformers
Before transformer hoisting, the transformer foundation, foundation tracks, or pre-buried steel plates should be inspected and approved. For overhead-mounted transformers, the overhead transformer platform should be inspected and approved to ensure the strength, geometric dimensions, coordinates, and heights of the transformer foundation or platform meet design and construction specifications. Generally, the transformer foundation tracks or pre-buried steel plates should be level and parallel. The transformer wheel gauge should match the track gauge, with the center aligned, allowing no deviation greater than 10mm. For transformers equipped with gas relays, there should be a 1% to 1.5% slope along the gas relay flow direction on the transformer top cover. When transformers use solid busbars to connect directly to the household, the centerline of the transformer foundation should align with the center of the wall partition; when connected to the busbars, the center of the busbars should align with the center of the transformer foundation. For transformers with rolling wheels, the wheels should rotate freely, and they should be securely fastened in place after the transformer is positioned.
When hoisting transformers, the wire ropes should be hung at the positions indicated in the manufacturer's manual to prevent damaging the transformer's casing or components. During transformer hoisting, it is crucial to lift and place it gently.
Transformer alignment is achieved using a level and plumb bob, ensuring compliance with design and specification requirements. Once the transformer is properly aligned, it should be securely fastened promptly.
Attachments that are directly connected to the fuel tank must be thoroughly cleaned and securely installed. The joints must be sealed without any oil leakage. After installation, the tank should be pressure tested with transformer oil at 70kPa for 30 minutes; no leakage indicates a pass. When refueling the transformer oil tank, the oil grade must meet the design specifications and be laboratory-certified. Ensure the oil quantity is adequate.
茂名干式变压器回收
茂名干式变压器回收
茂名干式变压器回收

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $2000.00 / A
Sales None
Delivery GuangdongGuangzhou
Stock 666AMOQ1A
Brand Sun Beauty
Product Date Product date not limited
Customized Processing No
Cash on Delivery Certainly
Expiry Long Valid
Update 2024-04-07 15:36
Gallery

Guangzhou Senmei Recycled Resources Co., Ltd.Published byMaoming dry transformer recycling, contributing to the construction of the new energy system.Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top