Beijing Zhongguangshengda Engineering Technology Co., Ltd.VIP

绳锯切割,混凝土切割,楼板切割拆除,工程打孔,绳锯切割
Enter Shop

Commercial Renovation Demolition, Hotel & Hotel拆除, Shopping Mall Demolition, Industrial Construction Demolition, Experienced in Construction

平台认证
  • Unit Price

    $160.00/square meters

  • Brand

    Zhongguang Shengda

  • MOQ

    1square meters

Contact
Leave Msg

Platform Service

Supplier Verified



北京中广盛达工程技术有限公司

VIP   数字营销第3年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Zhongguang Shengda

  • Unit Price:

    $160.00 / square meters

  • MOQ:

    MOQ1square meters

  • Total:

    1000square meters

  • Address:

    Beijing

  • Delivery:

    0Hours

  • View More

Description

During the demolition construction process at the shopping mall, the work should be carried out in sections and not vertically intersect. Holes on the work surface should be sealed. When demolishing buildings, attention must be given to the strict prohibition of large crowds gathering or materials being stacked on the floor slabs; when removing beams, ensure effective control of their descent before cutting the steel bars at both ends and slowly lowering them one end at a time; when removing columns, chip out the steel bars at the bottom of the column, use a manual winch to pull in the direction, and use gas welding to cut the steel bars on three sides of the column, retaining the steel bars on the front of the pull direction; when removing pipelines and containers, it is necessary to identify the type and chemical properties of the remaining substances, take appropriate measures before proceeding with the demolition work.

Demolition and Removal of Shopping Mall Reconstruction: The floor slabs are reinforced concrete. First, use a cutting machine to create an 800x800mm hole in the middle of the slab to be removed, then transport it to the ground floor outdoor area and break it apart. Demolition of Remaining Floor Slabs: Crush the remaining slabs to be removed with a hydraulic clamp, clean up the slabs to be removed; inspect if the removed concrete blocks pose any harm to other structures or individuals; when the hydraulic clamp cannot be used at 200mm from the frame column, manually chip away the remaining part, cut and remove the concrete blocks, and transport them to the client's external transportation site.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $160.00 / square meters
Sales None
Delivery Beijing
Stock 1000square metersMOQ1square meters
Brand Zhongguang Shengda
Construction Method Cutting, Drilling, Demolition
Quotation Method Call for Quotation
Construction Period Combine site assessment
Expiry Long Valid
Update 2024-02-21 15:20
Gallery

Beijing Zhongguangshengda Engineering Technology Co., Ltd.Published byCommercial Renovation Demolition, Hotel & Hotel拆除, Shopping Mall Demolition, Industrial Construction Demolition, Experienced in ConstructionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top