Construction Steps for Shenyang Water Storage Tank Products:
1. Basic treatment: Prior to construction, it is essential to understand geological data and soil bearing capacity, and conduct pit exploration tests on-site. If the soil bearing capacity is insufficient, requirements for the foundation should be proposed based on the design, and reinforcement measures should be taken, such as expanding the foundation or compacting the base.
2. Construct pool walls according to the design drawings, strictly controlling the verticality, slope, and elevation. When constructing the pool walls, lay stones in layers all around the perimeter as a whole, without dividing into sections or blocks for separate construction to ensure the integrity of the pool walls. The stones should be laid flat and securely, with the joints between layers staggered. The joints should be filled with mortar to be dense and compact. Before laying the stones, the surface should be moistened.
3. During pool wall construction, pre-burial预留 holes for water intake and outlet pipes are required, and proper anti-seepage treatment should be applied at the outlet pipe. The anti-seepage rings should be selected and installed based on the material of the outlet pipe or design specifications.
4. Bottom Construction. The construction process includes soil treatment, bricklaying with slabs, and concrete pouring, among other stages.