Preparation for Installation of an Embedded Fire Reservoir (Fire Pond)
The fire reservoir construction adopts a continuous workflow, primarily focusing on civil engineering, with water and electrical installations interlaced; the construction sequence is from underground to above ground, with special situations subject to temporary adjustments based on actual conditions.
Construction Site Preparation
To ensure the smooth progress of the construction, the following preparatory tasks must be completed prior to the start of work:
Site and Surrounding Environment Survey for Construction Area
(2) Survey and management of underground and overhead obstructions at construction sites.
(3) Site leveling and construction road construction
(4) Construction water and electricity connections
(5)完善的 waste and drainage systems
(6) Arrangement and setup of the on-site material storage yard;
(7) Layout of the internal roads and drainage systems.